| Sign In | Join Free | My futurenowinc.com |
|
| Categories | LED Light Kit |
|---|---|
| Place of Origin: | Guangdong, Mainland China |
| Brand Name: | LF |
| Certification: | ISO9001:2008, TS16949 |
| Model Number: | LF-FM0180 |
| MOQ: | 2000 PCS |
| Price: | Negotiable |
| Packaging Details: | Part in Bubble Bag, then in Cartons, Cartons on Plywood Pallet, Film wrapped overall then Nylon belt fastened Or to be Customized Means of Packing. |
| Delivery Time: | MOQ 2 Weeks,50,000pcs+ : 4 Weeks. |
| Payment Terms: | TT, L/C, D/P, Western Union |
| Supply Ability: | 100,000 PCS Per Month |
| Company Info. |
| LiFong(HK) Industrial Co.,Limited |
| Verified Supplier |
| View Contact Details |
| Product List |
Flood Light Led Light Aluminum Housing ASTM B 85-03 PAR38
Quick Details:
Precision Aluminum die casting & Aluminum casting
Application: PAR38 LED Light
Surface Treatment: Powder Coating
Depend on customer's requirements
Description:
Large Image: PAR38 Led Housing
Die Casting Aluminum Lamp Body
Application:
PAR38 Led Housing
Specification:
| Overall Dimension: | Dia101*H82mm |
| Surface Treatment: | Powder Coating |
| Part Weight: | 516g |
| Material: | A380 (Standard: ASTM B 85-03 Standard ) |

Die Casting workshop
Processing Technic:
1. Die Casting Tooling Making--Prototype/T1--Dimension Check-- Sample Approval-- SOP
2. Die Casting-- Remove Water Gap--Deburring-- Machining--Dilling Holes/ Threading-- Quality Check (dimension and surface) --Powder Coating--QC (Surface Vision Checking)-- Packing
High Quality Conversion Film Coating surface makes very good performance in Oxidation Resistance And Corrosion Resistance.
Advantages:
1. Professional Research and Design Team (20 Persons), Possess All Necessary Equipments.
2. Strict Quality Control in Each Process and Finish Product Quality Control
3. Short Delivery Lead Time: 15-30 Days
4. Optional For OEM or ODM
5. Comprehensive After-Sale Service, Quick Responses For Daily Communication
|