| Sign In | Join Free | My futurenowinc.com |
|
| Categories | Fiber Patch Panel & Closure |
|---|---|
| Place of Origin: | Shenzhen,China |
| Brand Name: | GT-Link |
| Certification: | ISO,CE,RoHS,GGS |
| Model Number: | GT-Rack Mounted Panel |
| Connector Type: | Connection Fibers,Pigtails |
| Length: | 8 / 12/ 24 ....... |
| Type: | cold rolled steel sheets galvanized |
| Color: | FC/LC/SC/ST |
| Polishing: | black or as customized |
| Operating Temperature: | 19" |
| Manufacturer: | -50~40 C |
| OEM: | 12-24 |
| Type 3: | E |
| Range: | φ22 |
| Ferrule: | Available |
| MOQ: | 50pcs |
| Price: | USD0.1~5.0/PCS |
| Packaging Details: | PP bag,carton box |
| Delivery Time: | about 7 days once confirmed |
| Payment Terms: | T/T,CASH,Western Union etc. |
| Supply Ability: | 2000pcs/day |
| Shiping Port: | Shenzhen |
Fiber Patch Panel SC 24Ports
| equence Number | Inspection Item | Requirement | Inspection Results | Conclusion | |
| 1 | Appearance and configuration | Appearance | Shape integnity, No defect,color uniform | Meets the requirements | Qualification |
| Optical Fibers Storage Set | Residual fiber length no less than 1.6m | >1.6m | |||
| Residual fiber curvature Radius no less than 30mm | >35mm | ||||
| Electric Connecting Set | Electnic connecting or shut off section in the box,ground lead-out section on the externl shell. | Meets the requirements | |||
| 2 | Seal performance | Charged with air which pressure is 60KPa±5KPa+65℃,20℃-40℃,2h10cycles,Allow air pressure change 5KPa,immersed in the water for 15min,no air bubbl escape | No air bubble escape,air pressure change is 4KPs | Qualificatio | |
| Sequence Number | Inspection Item | Requirement | Inspection Results | Conclusion | |
| 3 | Insulated Resistance | After soaked into the water which is 1.5m deep for 24h,Insulated resistance≥2×104MΩ | Between two metal sections | 1×106MΩ | Qualification |
| Betwwen metal section and ground | 1×106MΩ | Qualification | |||
| 4 | Voltage Resisting Strength | After soaked into the water which is 1.5m deep for 24h,DC 15KV holding 1min,No breakage,no electric arc | Between two metal sections | No breakage No electric arc | Qualification |
| Betwwen metal section and ground | No breakage No electric arc | Qualification | |||
| 5 | Seal performance | Charged with air which pressure is 100KPa±5KPaimmersed in the water for 15min,no air bubble escape;After remove for 24hr,air pressure keeps unchanged | No air bubble escape,air press keeps unchanged | Qualification | |
| 6 | Re-Seal performance | Repeat Seal performance 3 times,no air bubble escape;After remove for 24hr,air pressure keeps unchanged | No air bubble escape,air press keeps unchanged | Qualification | |
| Sequence Number | Inspection Item | Requirement | Inspection Results | Conclusion | |
| 7 | Axis Tensile | For 800N axis strength Charged with air which pressure is 60KPa±5KPa,last 1 min,air pressure keeps unchanged | Air press keeps unchanged | Qualification | |
| 8 | Crush | For 2000N/100mm,crush force,Charged with air which pressure is 60KPa±5KPa,last 1 min,air pressure keeps unchanged | Air press keeps unchanged | Qualification | |
| 9 | Impact | 16N·m,Charged with air which pressure is 60KPa±5KPa,air pressure keeps unchanged | Air press keeps unchanged | Qualification | |
| 10 | Bending | 150N,±45°,10cycles,Charged with air which pressure is 60KPa±5KPa,air pressure keeps unchanged | Air press keeps unchanged | Qualification | |
| 11 | Torsion | 50N,±90°,10cycles,Charged with air which pressure is 60KPa±5KPa,air pressure keeps unchanged | Air press keeps unchanged | Qualification | |
|