| Sign In | Join Free | My futurenowinc.com |
|
| Categories | Stainless Steel Fasteners |
|---|---|
| Brand Name: | TOBO/TPCO/TISCO/VALIN/METAL |
| Model Number: | Stainless Steel Fastener |
| Certification: | ISO/PED/TUV/SGS/LR/BV |
| Place of Origin: | China |
| MOQ: | 1000pcs |
| Price: | negotiable |
| Payment Terms: | T/T, L/C, Western Union, MoneyGram |
| Supply Ability: | 7500 tons per year |
| Delivery Time: | 15days-> |
| Packaging Details: | in plastic bags then in bundles |
| Application: | General Industry, Automotive Industry, Oil and Gas |
| Finish: | Plain |
| Thread: | Full Thread, Half Thread |
| Material: | Stainless steel |
| Brand: | TOBO |
| Head Style: | Hex |
| Length: | 4.5mm-100mm |
| Standard: | GB,DIN,ISO |
| Company Info. |
| TOBO GROUP LTD |
| Verified Supplier |
| View Contact Details |
| Product List |
Din7991 2205/ 2507 Hex Socket Screw With Nuts And Washer Full Thread Hot Sell Fasteners
| Product Name | Hex Socket Bolt |
| Brand | TOBO |
| Surface Treatment | Black Oxide, Zinc, Plain,HDG, Dacromet, etc. |
| Material | Carbon Steel, 304 316 Stainless Steel, Silicon Bronze, Titanium, Aluminium |
| Size | M1 - M60(1/8''- 4') |
| Grade | 4.8/ 8.8/ 10.9/ 12.9 |
| Place of Origin | China |
| Measurement System | Metric, Imperial (Inch) |
| Thread Type | UNC UNF |
| OEM | Available |
| Sample | Available |
| Certification | TUV/ISO9001/ISO14001/OHSAS18001 |
| Application | Building, Industry, Machinery |

1. 20 + years of production experience at your service.
2. The fastest delivery
3. The lowest price
4. Most comprehensive standards and materials for your choice.
5. 100% export.
6. Our products export to Africa, Oceania, mid east, eastern Asia,
Western Europe etc.
Packaging Details: Pallet/Wooden Case or as per your Specification
Delivery Detail: Shipped in 30 days after payment

A: We are factory.
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
A: Payment<=10000USD, 100% in advance. Payment>=10000USD, 50% T/T in advance ,balance before shippment.
|