| Sign In | Join Free | My futurenowinc.com |
|
| Categories | Projector Accessory |
|---|---|
| Brand Name: | Panasonic |
| Model Number: | ET-RFV400/410/RFL200 |
| Place of Origin: | China |
| MOQ: | 1 piece |
| Price: | Negotiated |
| Payment Terms: | Western Union, T/T, L/C |
| Supply Ability: | 1000 pieces per year |
| Delivery Time: | 3-7 work days |
| Packaging Details: | carton box |
| Warranty: | 3 months |
| Packing: | carton box |
| Product name: | projector air filter ET-RFV400/410/RFL200 |
| In stock: | Yes |
| Original: | YES |
| Application: | Education, Home, School, Business, Office |
| Support dimmer: | No |
| Shipping terms: | International Express, DHL |
Panasonic Projector Air Filter ET-RFV400/410/RFL200 For Good Clean
High quality filter Good dustproof performance and low wind resistance ensuring the cleanliness of the inside of the projector.
Product name | Projector air filter |
Place of origin | Guangdong, China(Mainland) |
Model number | ET-RFV400/410/RFL200 |
Application | Home,Office,Education,Cinema,Theater |
Packing | Standard package |
Suit for projector | Panasonic ET-RFV400/410: PT-BZ575NC,PT-BZ580C(ET-RFV410),PT-BW550C,PT-VW530, PT-VW535N,PT-VX600,PT-VX605N,PT-VZ570, PT-VZ575N,PT-BX650C, PT-BX655NC,PT-BX620C, PT-BX621C,PT-BW530C,PT-BW535NC,PT-BX631C,PT-BZ570C,PT-BX630C,PT-BX630C,PT-BX660C RFL200: CR2165W,CR2275X,CR2305X,CD2105X,CD2115X,CR2155X,CR2165X,CA4155W,CA4115X, CA4155X,CA4255X,CA4350X,CM4050X,CM4150X |


Our advantages:
1. Produuct: We habe many types of original projector accessories
suited for Phillip, Osram, Phoenix, and Panasonic.
2. Warranty: All the products have a warranty of 180 days, offer
you a shopping experience without worries.
3. Service: We have a professional team to provide you with
satisfactory after-sales services.
4. OEM: We have an experienced technical team to provide you with
OEM services.
5. Price: Compared with your competitors, we have better quality
and cheaper price.
A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.
A:Sample needs 3-5 days, mass production time needs 5-7 days for order quantity more than
A: Low MOQ, 1pc for sample checking is available
|