| Sign In | Join Free | My futurenowinc.com |
|
| Categories | Heat Exchanger Tubes |
|---|---|
| Brand Name: | Torich |
| Model Number: | BS3059 |
| Certification: | CE ISO |
| Place of Origin: | Zhejiang,China |
| MOQ: | 1 ton |
| Price: | 1000-1500 USD PER TON |
| Payment Terms: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
| Supply Ability: | 50000tons Per year |
| Delivery Time: | 30-35days |
| Packaging Details: | wooden box or woven bag |
| Product name: | 50.8*2.64 Seamless Heat Exchanger Tubes |
| Keyword: | Heat Exchanger Tubes |
| Technical standard: | BS3059 |
| Material: | part320 10# 20# |
| End use: | boiler and heat exchanger |
| Type: | cold darwn seamless |
| Section shapee: | Round |
| regular size: | 25.4,12.7,38.1,50.8 |
| Coating: | Aluminized |
| Company Info. |
| TORICH INTERNATIONAL LIMITED |
| Verified Supplier |
| View Contact Details |
| Product List |
1.standard
BS3059
2.Grade
part320 10# 20#
3.Application
boiler and heat exchanger
4.Spcificaton
O.D:5-420mm
W.T:0.5-50mm
Length: maximum 12000mm,can be customized
5.Technique
cold-drawn cold-rolled
6.Delivery condition
| Designation | Symbol | Descriptions |
| Cold drawn/hard | +C | The steel tube is not heat treated after the final cold processing |
| Cold drawn/soft | +LC | The final heat treatment is followed by appropriate processing |
| Cold drawn and stress relieved | +SR | Finally, after cold working,the steel tube is subjcted to stress removal annealing in a controlled atmosphere |
| Annealed | +A | After the final cold work, the tubes are fully annealed in a controlled atmosphere |
| Normalized | +N | After the final cold work, the steel tube is normalized in a controlled atmosphere |
Production process

Certification

About us

Exhibition

FAQ
Q1:What your terms of delivery?
A: EXW, FOB ,CFR ,CIF DDU
Q2:How about your delivery time?
A:Generally speaking, it is 5-7 days if the goods are in stock,or it is 30-45days if the goods are not in stock,it is accroding to quantity.
Q3:Can you produce accroding to the samples?
A:Yes,we canproduce by your samples or technical drawings
Q4:What your terms of packing?
A:T/T 30% as deposit,and 70%before delivery.we'll show you the products and packages before you pay the balance.
|