| Sign In | Join Free | My futurenowinc.com |
|
| Categories | LED Street Light Lens Modules |
|---|---|
| Brand Name: | ChenMu |
| Model Number: | CM-SZ130130-XX-30/60W |
| Certification: | ROHS,UL,SGS,CE |
| Place of Origin: | Zhejiang,China |
| MOQ: | 100PCS |
| Price: | Negotiable |
| Payment Terms: | T/T, Western Union, MoneyGram |
| Supply Ability: | 100000PCS/Per week |
| Delivery Time: | 7-10 working days |
| Packaging Details: | In Carton Box |
| Module Size (mm): | 160x140 |
| Lens Size (mm): | 130x130 |
| Power: | 30-60W |
| Warranty: | 5 years |
| Company Info. |
| ChenMu Lighting technology co., Ltd. |
| Verified Supplier |
| View Contact Details |
| Product List |
30W /60W SMD 5050 Led 130x130mm Waterproof IP66 LED Street Lighting Moudle
Detailed
| Distribution | Module Size (mm) | Lens Size (mm) | Power | LED | LED QTY | Warranty |
| CM-S130-XX-30/60W | 160x140 | 130x130 | 30-60W | 3030/2835 | 64 | 5years |
| CM-S130-XX-5050-30P | 160x140 | 130x130 | 30-60W | 5050 | 30 | 5years |
Description
Specifications
| Product Name: | CM-SZ130130-XX-30/60W |
| Beam Angle: | 60° 90°/80*150° |
| Temperature: | 4500~5700 |
| Ambient temperature range: | -40℃~+50℃ |
| Lumen s Flux(Type.) | >130lm/W |
| Heat sink | AL Extrusion 6063 |
| LIFE SPAN | ≥50000 小时 @Ta=25℃ |
| Application: | Flood Lighting,Led Street Lighting ,Tunnel lighting |
| WARRANTY: | 5 Years |
| Quatity Guarantee: | If you receive a defective item, please email us a picture of the defective part. We will arrange for a reshipment or refund to you. |
| Main Maket | Europe,South America,North America,Asia ect |
Shipping and Delivery
Trade Terms: | EXW , FOB , CNF , CIF |
| Payment Terms: | T/T , PayPal , Western Union, Moneygram |
| Delivery time: | 2-3 working days for samples order, 5-7 working days for bulk order |
| Shipment Terms | By Sea, By Air, By Express like DHL, Fedex, UPS, TNT, etc |
IES

Drawing

Notices
FAQ
1) Can I have a sample order?
A: Yes, we welcome sample order to test and check quality.
Mixed samples are acceptable.
3) What is the lead time?
A:Sample needs about 3-5 days prepared; mass production time needs 7-10 days normally.
|