| Sign In | Join Free | My futurenowinc.com |
|
| Categories | Tanks Trucks And Trailers |
|---|---|
| Brand Name: | CLW |
| Model Number: | CLW5636 |
| Certification: | CCC,ISO,BV,SGS |
| Place of Origin: | Suizhou, China |
| MOQ: | 1 Unit |
| Price: | Negotiable |
| Payment Terms: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
| Supply Ability: | 500 Unit/Month |
| Delivery Time: | 30-35 days |
| Packaging Details: | Naked packing,Ro-ro,Bulk Ship |
| Tread: | 1310mm |
| Grade: | Heavy Duty |
| Independent Suspension Type: | Leaf Spring |
| Shape: | Tank Semi Trailer |
| Axle Number: | 4 Axles |
| Tire Number: | 16 Pieces with 1 Spare Tire |
| Self-dumping: | Not Self-dumping |
| Material: | Steel |
| Condition: | New |
| Tank Capacity(Cbm): | 40cbm, 40000liters, 4000L, 40m3 |
| Tank Material: | Carbon Steel |
| Loading Medium: | All Kinds of Bitumen/Hot Bitumen |
| Axle Brand: | Fuwa/L1/Germany Brand BPW |
| Axle Quantity: | 4 Axles |
| Burner: | International Brand Italy Riello |
| Thermometer: | China Local Brand/International Brand |
| Level Gauge: | Optional |
| Tire: | 315/80r22.5 Tubeless Tires |
| Suspension: | Leaf Spring |
| Color and Logo: | Customized |
| Transport Package: | Naked with Wax |
| Specification: | 40m3/40tons |
| Origin: | Suizhou, China |
| Company Info. |
| HUBEI CHENGLI SPECIAL AUTOMOBILE CO,.LTD |
| Verified Supplier |
| View Contact Details |
| Product List |
1. Tank material:
a: Internal Tank: Shell 5mm steel Q345B ; End 6mm steel Q345B
b. Insulation Interlayer: Inflaming 150mm thick Rock wool
compressed to 100mm around the internal tank
c. Outer Shell: Covered with stainless steel sheeting. Fastened by
stainless steel full circular clamp rings with rubber seal
2. Burner: Italian RIELLO with a special fuel tank
3. Heating Pipeline: 1 set U shape heating pipe by seamless steel inside the tank body,
connected to burner
4. Hydrostatic test: Pressure Testing - hydrostatic 150kpa each compartment
5. Landing gear: OST landing leg. Lifting capacity 28 ton, static capacity 72 ton.
Product Specification
| Tank Body | |||
| Effective Volume | 40000+(3%~5%) | ||
| Material | Internal Tank | Shell 5mm steel Q345B ; End 6mm steel Q345B | |
| Insulation Interlayer | Inflaming 150mm thick Rock wool compressed to 100mm around the internal tank | ||
| Outer Shell | Covered with stainless steel sheeting. Fastened by stainless steel full circular clamp rings with rubber seal | ||
| Shell finish | Internal tank sandblasted to SA 2.5 and painted epoxy zinc phosphate primer (anti-corrosion), then covered by insulation fastened by clapping. Logo design as per customer's requirement | ||
| Heating Pipeline | 1 set U shape heating pipe by seamless steel inside the tank body, connected to burner | ||
| Sub-beam | Standard features of a full length "T" shape sub-frame welded to tank bottom | ||
| Hydrostatic test | Pressure Testing - hydrostatic 150kpa each compartment | ||
| Tank Fittings | |||
| Burner | Italian RIELLO with a special fuel tank | ||
| Manhole cover | 2-off Φ500 easy-open type manhole cover | ||
| Breather Valve (safety valve) | 2-off aluminum breather valves | ||
| Discharge valve | 1-off 4'' outlet with 4'' cam-in groove adaptor at rear of tank | ||
| Temperature Gauge | 2-off measurement range 0ºC~300ºC | ||
| Interlock system | 1-off, the brake is locked when master switch is pulled | ||
| Hose and hose carrier box | 1 nos (LHS) and 1 nos (RHS) hose carrier to fit 4" x 6 meter hose
close type complete brackets to be installed at discharge side. Hose with coupling at one end. | ||
| Running Gear | |||
| Main Beam | Submerged-arc welding "I" beam mounted to the tank body | ||
| Kingpin / plate | 12mm thick high tensile steel skid plate bolts directly to the
double web reinforced under frame at front completed with bolted
kingpin. c/w 3.5" kingpin | ||
| Landing gear | JOST landing leg. Lifting capacity 28 ton, static capacity 72 ton. | ||
| Axle | FUWA 4 axles * 13 tons capacity | ||
| Suspension | Mechanical Reinforced Multi Leaf Spring. Suspension frame Mild steel fabricated for heavy duty usage | ||
| Brake system | Two line air-brake systems comprising of emergency relay valve, 30/30 spring brake chamber on one axle, air reservoir and contact type couplings. With 4S/2M ABS | ||
| Tires | 17pcs 315/80R22.5 tubeless tires, TRIANGLE brand, include 1 spare | ||
| Rims | 17pcs 9.00*22.5 steel tubeless rims, include 2 spare rim | ||
| Others | |||
| Walkway | Anti-skid walkway fitted with carbon steel grating | ||
| Ladder | Detachable steel fabricated with steps not more than 300mm, mounted at the front of tank. Clearance between ladder and tanker end not less than 100mm | ||
| Handrail | Aluminum manual operated collapsible handrail fixed on the top of tank, 800mm height | ||
| Tool box | 1 off lockable tool box to be position at passenger side of tanker | ||
| Side guard | Side Guard be provided made of steel material on both side of the tanker with guard clearance of 450- 550mm | ||
| Mudguard | Whole piece of 2.0 mm minimum steel plates type c/w mud flaps, suppressor and clips | ||
| Rear bumper | Steel bumper to accommodate light assembly and number plates to cover full width of the tank. Maximum ground clearance shall be 450mm-550mm and 150mm from near most of tank | ||
| Extra Fuel Carrier | 1000Liters extra fuel tank attached under tank position | ||
| Fire extinguisher holder | 2-off x8KGS dry powder fire extinguisher | ||
| Anti-Static System | 1-off earthing strip to be installed at the rear of tanker. 1-off grounding bonding reel (copper / brass clamp). | ||
| Light & Wiring | Standard front, side and rear. Comply with the road regulations and
oil industry standard. 24 volt system, 7 wires ISO socket.
Red/brake, white/reverse and amber/direction indicator, LED tail
lamp 8pcs side marker lamp | ||
| Reflective tapes & sticker | Standard or as per customers requirements | ||
| Reverse alarm | 24V audible reverse beeper | ||
Reference Photos



It used for transporting heated bitumen, emulsified bitumen and
modified asphalt.
A pump is optional to discharge the bitumen outside. Under the
strict inspection by goverments, it is tesed by air, water, X-ray.
Factory overview

After-sale service
a. Before purchasing:
1-Quick reply on customers' inquiry
2-Professional suggestion on truck choice according to different countries.
3-Details quotation with spec.and reasonable price.
4-Welcome to visit our company before purchasing.
b. After purchasing:
1-Production pictures and video updated every week.
2-Customer can visit factory after truck completion or arrange third party inspection.
c. After-sales service:
1-English Operation Video
2-Free operation and technical train at factory but not include accommodation
3-Spare parts supplied at factory price whenever needed.
4-Engineers can be sent to your country and offer local engineering support and train.
|