Sign In | Join Free | My futurenowinc.com |
|
Categories | Circular Loom Machine |
---|---|
Brand Name: | unitedwin |
Model Number: | SBY-2200×6 |
Place of Origin: | CHINA |
MOQ: | 1 set |
Price: | USD |
Supply Ability: | 3 sets/ month |
Delivery Time: | 3 months |
Payment Terms: | L/C, T/T |
Packaging Details: | Wooden case |
Name: | Circular Loom Machine |
Type: | SBY-850x6S |
Number of shuttles: | 6pcs |
Nolding width of cloth: | 300~850mm |
Number of warp: | 720pcs |
Weft density: | 20-75picks/100mm |
Running speed of main motor: | 135-150r/min |
Power of main motor: | 3kw |
Specification of bobbin(ID×L): | 28-38x230mm |
Max. weft bobbin diameter: | 1155mm |
Overall dimension(L×W×H): | 10500x2800x2920mm |
Weight of machine(about): | 2000kg |
Warranty: | 1 Year |
Company Info. |
CHANGZHOU UNITED WIN PACK CO.,LTD |
Verified Supplier |
View Contact Details |
Product List |
PP Woven Bag Making Machine SBY-850x6S Six Shuttle Circular Loom Machine
Performance Characteristics:
SBY series circular loom machine, which adopts the Single Chip
Microcomputer(SCM), carry out centralized control to the system;
the parameter is set up and changed on Human Machine
Interface(HMI). Main motor and take-up motor are respectively
driven by dual inverters. The system can change and update the data
in time, reaching high accuracy and move ahead simultaneously. The
function of accurate weft cloth compensate, can carrying on by weft
density adjustment in time, improving fabric's quality and the
qualification rate. Mechanical malfunction can be displayed in
sub-area and recorded in detail.
Main technical Datas:
ltem | SBY-850x6S |
Number of shuttles(pcs) | 6 |
Nolding width of cloth | 300~850mm |
Number of warp | 720 |
Weft densith | 20-75picks/100mm |
Running speed of main motor | 135-150r/min |
Power of main motor | 3kw |
Specification of bobbin(ID×L) | 28-38x230mm |
Max. weft bobbin diameter | 1155mm |
Overall dimension(L×W×H) | 10500x2800x2920mm |
Weight of machine(about) | 2000kg |
Applications:
1. How long will your engineer reach our factory?
Within one week after everything ready (machine arrival your
factory, power source, air compressor etc. Prepared)
2. How many days will you finish installing?
We will finish installation and training within 15 days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's air tickets,
hotel, food, and also their salary 150USD one day per person.
4. Does your engineer understand English?
Our engineers understand a little English. All our engineers have
more than five years machine installation experience.
5.How could you do if the parts broken within warranty?
We would express the free replacement parts during the warranty
date
![]() |