| Sign In | Join Free | My futurenowinc.com | 
              
  | 
      
| Categories | Heat Exchanger Tubes | 
|---|---|
| Brand Name: | TORICH | 
| Model Number: | ASTM A179/A192 | 
| Certification: | ISO9001,ISO14001,TS16949 | 
| Place of Origin: | Zhejiang,China | 
| MOQ: | 3 TONS | 
| Price: | 900-1500 USD PER TON | 
| Payment Terms: | T/T, L/C, D/A, D/P, Western Union, MoneyGram | 
| Supply Ability: | 5000 TONS PER MONTH | 
| Delivery Time: | 20-45 DAYS | 
| Packaging Details: | packing in anti-rust oil p in bundles or wooden box | 
| Product name: | ASTM A179 19.05x2.11 Heat Exchanger Tube | 
| Keyword: | 19.05x2.11 Heat Exchanger Tube | 
| Application: | For High Pressure Boiler and Superheater Tubes | 
| Standard: | ASTM A179/A192 | 
| Technique: | Cold Drawn | 
| Material: | A179 | 
| Surface: | According to customer's request | 
| WT: | 1-25.4mm | 
| OD: | 12.7-177.8mm | 
| Length: | Max12000mm | 
| Company Info. | 
| TORICH INTERNATIONAL LIMITED | 
| Verified Supplier | 
| View Contact Details | 
| Product List | 
Standard  | ASTM A179  | 
Matrial  | 10# 20# etc Carbon Steel  | 
Size  | OD: 12.7-177.8mm WT: 1-25.4mm Length: according to customer
requirement  | 
Application  | For Boilers,Superheaters, Heat-Exchangers, High-pressure Boilers  | 
Production  | Tubes are manufactured by seamless process and both hot finished
and cold finished are applicable  | 
Heat treatment  | Hot finished tubes need not be heat treated. Cold Finished tubes are heat treated after the final cold finishing pass at a temperature of 1200℉(650℃) or higher  | 
C  | 0.06-0.18  | 
Mn  | 0.27-0.63  | 
P  | ≤0.035  | 
S  | ≤0.035  | 
Si  | ≤0.25  | 
Brinell Hardness  | Rockwell Hardness Number  | 
WT≥0.200 in (5.1mm)  | WT≤0.200 in (5.1mm)  | 
137 HRB  | 77HRB  | 
Mechanical Properties Tests and Inspection
Tensil Streghth: min ksi[Mpa] 47[325] Flattening Test Flaring Test
Yield Point: min ksi[Mpa] 26[180] Flange Test Hardness Test
Elongation: ≥35% Hydrostatic Test
QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring
Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield
Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking
100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a
perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate
longitudinal and transversal defects.
                                 
                             |