VIBRA Hydraulic Vibratory Pile Hammer: Versatile Foundation Piling
Solution for All Projects
Core Keywords
Vibratory Pile Hammer, Hydraulic Pile Hammer, Foundation Piling
Equipment, Excavator-Mounted Pile Hammer, Multifunctional Pile
Hammer
Product Overview
The VIBRA hydraulic vibratory pile hammer is a high-performance
piling device engineered for diverse foundation engineering needs.
Compatible with 7–60 ton excavators (any brand), it excels in
driving, pulling, soil densification, and vertical drainage. Widely
applied in municipal projects, bridges, cofferdams, building
foundations, and small-to-large-scale construction, it delivers
reliable and efficient performance across scenarios.
Key Features
- Multifunctional Versatility: Drives and pulls steel sheet piles,
cement piles, rail piles, H-beams, and iron plates; also supports
soil densification and vertical drainage.
- Universal Compatibility: Works with any brand of excavator (7–60
tons) and adapts to different tasks by simply changing chucks.
- Adjustable Vibration: Vibration frequency (2500–3200 rpm) is
adjustable via a variable pump, customizing performance for diverse
project requirements.
- Compact & Powerful: Hydraulic motor features small volume and light
weight, while outputting high power and speed for efficient
operation.
Core Advantages
- Low Noise & Eco-Friendly: Equipped with a rubber sheath to reduce
noise, ensuring quiet operation and solving environmental concerns.
- High Efficiency: Fast operation conversion and short working
periods minimize project timelines and maximize productivity.
- Comprehensive Protection: Prevents damage to pile tops/bottoms
(steel pipe, sheet, rail piles) and nearby buildings, even during
close-proximity work.
- Easy Pile Pulling: Requires less force for extraction compared to
other piling systems, simplifying complex pulling tasks.
- Reliable Quality: Strictly complies with the technical standards of
“Technical Conditions for Pile Driver Enterprises," guaranteeing
durability and stability.
Technical Parameters
| Item | FV-100 | FV-150 | FV-250 | FV-280 | FV-300 | FV-330 | FV-350S | FV-350 | FV-400 |
|---|
| Vibration Frequency (rpm) | 2500 | 2500 | 2800 | 3200 | 3200 | 3200 | 3200 | 3200 | 3200 |
| Operation Pressure (Mpa) | 30 | 30 | 32 | 32 | 32 | 32 | 32 | 32 | 32 |
| Centrifugal Force (KN) | 117 | 172 | 265 | 335 | 350 | 372 | 435 | 455 | 485 |
| Max. Pile Length (m) | 6 | 8 | 10 | 12 | 12 | 12 | 15 | 15 | 18 |
| Arm Weight (kg) | 160 | 160 | 500 | 500 | 670 | 670 | 670 | 750 | 750 |
| Hammer Weight (kg) | 850 | 1100 | 1700 | 1900 | 2100 | 2300 | 2400 | 2600 | 2700 |
| Compatible Excavator (T) | 7-12 | 12-17 | 20-30 | 20-30 | 30-35 | 33-40 | 35-40 | 40-45 | 45-60 |
| Eccentric Moment (kgm) | 1.7 | 2.2 | 2.8 | 4.0 | 5.5 | 6.9 | 7.4 | 6.2 | 6.7 |
About Yekun Construction Machinery
Yekun Construction Machinery is a technology-driven enterprise
specializing in the production, sales, and service of vibratory
pile hammers and peripheral accessories. Our VIBRA-branded products
(including mini hydraulic pile hammers) meet advanced industry
quality standards, with nationwide distribution and global exports.
Backed by a young, enterprising team, we prioritize customer value
and strive to become the most reliable, comprehensive, and
professional supplier of piling equipment and services.
Frequently Asked Questions (FAQ)
- Warranty Period: 12 months (from installation completion) for the
mainframe and key components (excluding wearing parts).
- MOQ: 1 set is available.
- Payment Methods: T/T and D/P.
- Delivery Time: 7–35 days (delivery to Shanghai Port); additional
shipping time applies to overseas orders.
- Custom Logo: Available.
- Product Quality: Strictly complies with the technical standards of
“Technical Conditions for Pile Driver Enterprises."
- Dealer Opportunities: Welcome to become our dealer; we look forward
to developing regional general agents and strategic partners.
- Order Process:
- Provide your required model, quantity, and other requirements.
- We issue a Proforma Invoice (PI) after confirming price and
details.
- Production starts upon receipt of the confirmed PI and your
deposit/original L/C.
- We notify you of the shipment date and details once goods are
ready.
- We track the shipment until safe delivery.