| Sign In | Join Free | My futurenowinc.com |
|
| Categories | Aluminum Foil Roll Film |
|---|---|
| Brand Name: | oripack |
| Place of Origin: | china |
| MOQ: | 300kg |
| Price: | $7-8 |
| Payment Terms: | T/T, Western Union |
| Supply Ability: | 300000-500000pcs per day |
| Delivery Time: | 25days |
| Packaging Details: | inner plastic bag, outside paper box |
| Material: | AL+PP/PS/PE glue or PP/PS/PE film |
| Logo: | can be custom printed |
| Width: | custom made |
| Application: | Yogurt,Ice cream,Fruit,Juice packaging etc |
| Product name: | Custom logo Aluminum foil roll for yakult yogurt plastic bottle packaging |
| Color: | Up to 8 colors |
| MOQ: | 300kg |
| Embossing: | available |
| Alloy: | 8011 |
| Thickness: | 80-100 micron |
| Company Info. |
| Oripack Ltd |
| View Contact Details |
| Product List |
Aluminum foil roll for yogurt packaging packaging material
Custom logo Aluminum foil roll for yakult yogurt plastic bottle packaging
| Indurial Use | Yogurt ,Ice cream,fruit,juice, sauce etc packaging |
| Material | Al+PP/PS/PE film or AL +PP/PS/PE film |
| Color | Up to 8 colors |
| MOQ | 300kg |
| Size | custom made |
| Alloy | 8011 |
| Thickness | 80-100 micron |
| Packaging | 18000pcs/carton |
Material structure


Product details






Processing


Packing and Delivery


Company


The brand we cooperated

Customer

FAQ
Q1. Can I have a sample order for Aluminum ?
A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.
Q2. What about the lead time?
A: 5-7 days for Sample preparing ,20-25 working days for mass production.
Q3. Do you have any MOQ limit for Cup and foil lids order?
A: 100000pcs
Q4. How do you ship the goods and how long does it take to arrive?
A: Ship by DHL, UPS, FedEx or TNT. It takes 5-7 days to arrive. Airline and sea shipping also optional.
Q5. How to proceed an order for foil lids?
A: Firstly let us know which size of foil lid you required ?
Secondly packaging what products?
Thirdly with or without logo printing
Fourthly We will confirm the above details then arrange the production.
|