Sign In | Join Free | My futurenowinc.com
futurenowinc.com
Products
Search by Category
Home > Mosaics >

15m Hydraulic Impact Highway Guardrail Pile Driver With Received Rubber Sheath

Categories Hydraulic Pile Driver
Brand Name: VIBRA
Model Number: FV-350
Place of Origin: SHANGHAI
MOQ: 1 set
Price: Negotiation
Payment Terms: L/C, T/T, D/P
Supply Ability: 15 set/month
Delivery Time: 7-35 days
Packaging Details: 7.14 CBM
Name: Excavator Mounted Hydraulic Pile Driver
Feature: High Speed
Vibration: 3200rpm
Pressure: 32Mpa
Hammer: 2600kg
Arm: 750kg
Max.Pile Length: 15m
Centrifugal Force: 455kn
Excavator Weight: 40~45 ton
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

15m Hydraulic Impact Highway Guardrail Pile Driver With Received Rubber Sheath


Convenience in dismantling, transportation and maintenance


Since we have constantly improved our design of pile drivers , every part of the machine is easy to be taken apart, which provides convenience in transportation and maintenance.


Compared with the pile drivers made by other companies, ours are more convenient to be taken apart and shipped as the connection and lay out of the long boat and the short boat are different.


Features


  • Pile driving steel sheet pile, concrete pile, steel rail pile, iron plate, H steel etc.
  • Speedy changing over activity; Applied to different work spaces.
  • Contrasted with different frameworks , less power needed for pile pulling
  • Not harm the top or lower part of steel pipe pile, steel plate pile and steel rail pile.
  • Not harm the structure even frequently work close to it.
  • Received Rubber sheath to lessen commotion and vibration, the activity is tranquil and the functioning period is short;It is useful to defeat ecological issues.
  • As per the situation course of sheet pile and site conditions, the sheet pile can be clipped or brought down by sure and negative pivot of 180°. The vibration recurrence can be changed by two levels, and the two-level twofold siphons are joined to enormously build the excitation power.
  • Water driven engine has little volume and light weight, yet it can yield high force and rapid.
  • Vibration recurrence can be changed by factor siphon. It tends to be utilized in tractor activity of any brand, and can meet distinctive work prerequisites solely after evolving hurls.


Technical Parameter


ItemFV-250FV-280FV-300FV-330FV-350LFV-350FV-400
Vibration (rpm)2500280032003200320032003200
Pressure (Mpa)30323232323232
Centrifugal Force (KN)265335350372435455485
Max.Pile (m)10121212151518
Arm (kg)500500670670670750750
Hammer (kg)1700190021002300240026002700
Excavator (T)20-3020-3030-3533-4035-4040-4545-60


About Us


Shanghai yekun Machinery Co., Ltd was founded in 2014, A professional company involving in hydraulic vibrating pile driver manufacture, sale and service. Our company take the latest high speed hydraulic vibrating pile driver and its components as the main products. Our products vastly apply for infrastructure & construction industries.


We focus on product quality with the latest industrial technology. The mini hydraulic vibrating pile driver lead the industrial trend. The middle and large hydraulic vibrating pile driver also are highly recognized by our clients. At the same time, we actively cooperated with the engineering machinery factory and construction company to jointly develop more functional professional equipment, and we hired foreign professionals as our technical adviser.


Our company is consisting of a young, enthusiasm professional team. Adhere to client as priority, Quality as first concern, Management as foundation. We are working for the direction to become the most professional and comprehensive hydraulic vibrating pile driver manufacture and service supplier.



FAQ


Q: How long is the warranty period ?

A: The warranty period is 12 months from the date of completion of installation, the mainframe and key components, except for wearing parts.


Q: What is the MOQ ?

A: 1 set is available.


Q: What's the payment method ?

A: L/C, T/T and D/P payment.


Q: What is the delivery time ?

A: The delivery time is generally 7-35 days, and arrive at Shanghai Port. Shipping time should be considered overseas.


Q: Can I have our LOGO on the machine ?

A: Of course you can.


Q: How is your product quality ?

A: Our equipment is strictly implemented in accordance with the technical standards of "Technical Conditions for Pile Driver Enterprises".


Q: Can I be your dealer ?

A: Welcome to become our dealer, and we are looking forward to further developing into a regional general agent and strategic partner like you with lofty ideals!


Quality 15m Hydraulic  Impact Highway Guardrail Pile Driver With Received Rubber Sheath for sale
Send your message to this supplier
 
*From:
*To: Shanghai Yekun Construction Machinery Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0