| Sign In | Join Free | My futurenowinc.com |
|
| Categories | Construction Site Hoist |
|---|---|
| Brand Name: | KANGBO |
| Model Number: | Construction Site Hoist Rack Pinion Type VFD Single Cage SC100(BZ) KP-B01 |
| Certification: | TUV |
| Place of Origin: | CHINA |
| MOQ: | 1 set |
| Price: | In negotiate |
| Payment Terms: | T/T, L/C |
| Supply Ability: | 300 sets per month |
| Delivery Time: | 25 days after receipt of down payment |
| Packaging Details: | A 40'HQ container can load one set of 60 meter high hoist |
| Description: | Construction Site Hoist Rack Pinion Type VFD Single Cage SC100(BZ) KP-B01 |
| Application: | Construction site, building site, bridges, chimney, plants, etc |
| Design: | According to European Standard and Truly modular |
| Production: | Standardized production, Processed by CNC machines, Laser, Robots in assembly line. |
| Material: | Q345B steel |
| Finishing: | Sandblasting and Painted, Galvanised |
| Company Info. |
| Xiamen Comwinning Imp.&Exp.Co.,Ltd |
| Verified Supplier |
| View Contact Details |
| Product List |
Products Description
SC100BD CONSTRUCTION MATERIAL HOIST FOR LIFTING PASSENGER MATERIAL Single/Galvanied/inverter provide operation speed:low,middle,high material hoist accessory is optional according to client request | |
| model | SC200/200BD |
| height | 100m |
| Payload Capacity: | 1x1000 |
| speed | 0-40m/min |
| cage | Cage nos.: SINGLE Driving Cabin: W/O Internal Dims.: 3.2mLx1.5mWx 2.3mH Wall: Alu. Pannel + Punched hole Alu.plate Finish: Painting |
| mast section | Dims.: 650mm x 650mm x 1508mm/100mx4.5mm Finish :Galvanied |
| VFT | 2x37KW,VEICHI |
| Power supply | 60HZ/380V, 3PH |
| safety device | SAJ40-1.2 |
| cable | 3x16+2x10, 110mx2 |
| remard | Tie-in,windproof, Cable Trolley, Erection Jib, Base Enclosure and Overload Device are included. |
Product parameter
1. Low operating cost but high efficiency;
2. Simplicity in operation;
3. High degree of safety;
4. Long durability;
5. Low energy consumption.
6. CE, ISO and GOST certificates.
Features of SC200/200 Construction Elevator
1. It is equipped with fully safety devices to guarantee the safe working;
2. Stable running and comfortable adaptability;
3. The transmission system adopts two-drive motors and three-drive motors. Planar double-eveloping worm gear reducer is adopted ensuring the high efficiency, max payload and long service life;
4. Simple electrical control system, easy operation and convenient maintenance withlow failure rate.
|