| Sign In | Join Free | My futurenowinc.com | 
              
  | 
      
| Categories | Magnetic Separation Equipment | 
|---|---|
| Brand Name: | Y&X | 
| Model Number: | Wet Magnetic Separator | 
| Certification: | Quality Management System Cerification | 
| Place of Origin: | China | 
| MOQ: | 1 | 
| Payment Terms: | T/T | 
| Delivery Time: | 30 days | 
| Packaging Details: | Standard Shipping Packaging | 
| Name: | Wet Magnetic Separator | 
| Application: | Magnetic Separation Equipment | 
| Energy: | Energy Saving | 
| Dimensions of Cylinder: | 600 | 
| Motor Power: | 20~40KW | 
| Production Capacity: | 0~0.6(t/h) | 
| Weight: | 1.5T | 
| Origin: | China | 
High Efficiency High Intensity Wet Mining Wet Drum Magnetic Separator
Features
Good anti-demagnetization ability and reliable protection measures. Through shaft structure makes the roller run more reliably and safely.
Parameter
| Models and specifications | Dimensions of cylinder | Rotating speed of cylinder (r/min) | Magnetic induction intensity (mT) | Feed particle size (mm) | Production capacity (t/h) | Motor power (KW) | Overall dimensions | Weight (t) | 
| (L x W x H) (mm) | ||||||||
| CTB-618 | 600 | 1800 | 35 | 150~800 | 0~0.6 | 20~40 | 3180 × 1300 × 1115 | 1.5 | 
| CTB-718 | 750 | 1800 | 35 | 150~800 | 0~0.6 | 20~40 | 3175 × 1965 × 1500 | 2.2 | 
| CTB-918 | 900 | 1800 | 24 | 150~800 | 0~0.6 | 25~55 | 3175 × 1510 × 1590 | 3 | 
| CTB-924 | 900 | 2400 | 24 | 150~800 | 0~0.6 | 35~70 | 3740 × 1510 × 1590 | 4 | 
| CTB-1018 | 1050 | 1800 | 22 | 150~800 | 0~0.6 | 40~75 | 3575 × 1660 × 1740 | 4 | 
| CTB-1024 | 1050 | 2400 | 22 | 150~800 | 0~0.6 | 52~100 | 4137 × 1660 × 1740 | 5.5 | 
Why choose our company machine?
Q1: Hi, are you a mining machinery manufacturer?
Answer: Yes, we are a professional manufacturer of mining machine.
Our company welcomes customers to visit our factory at any time.
Q2: How long is the warranty period of your equipment? Does your
company provide spare parts?
Answer: The warranty period of our machine is one year. For those
wearing parts, we guarantee to provide high-quality parts for a
long time.
Q3: How long does it take to deliver?
Answer: Production usually starts after receiving the advance
payment. Small machine is guaranteed to be delivered within one
month. Large-scale machine is guaranteed to be delivered within 2-3
months.
Q4: Do you provide machine operation guidance?
Answer: Yes. We have professional engineers for installation,
commissioning and operation guidance.
                                 
                             |