| Sign In | Join Free | My futurenowinc.com |
|
| Categories | Short Stress Path Rolling Mill |
|---|---|
| Brand Name: | Yushun |
| Model Number: | Customized |
| Certification: | ISO 9001 |
| Place of Origin: | Jiangsu, China |
| MOQ: | 1 set |
| Price: | Negotiated |
| Payment Terms: | L/C, T/T |
| Supply Ability: | Negotiated |
| Delivery Time: | 30 days |
| Packaging Details: | normal package naked or pack it according to customers' request |
| Name: | High Efficiency and High Precision Short Stress Rolling Mill for Rod/Rebar Production line |
| Type: | Non-stand rolling mill |
| Condition: | New |
| Warranty: | 1 Year |
| Usage: | Steel construction |
| Power: | 200-1000KW |
| Voltage: | Depending on production |
| Finished Product: | Wire rod,rebar,bar,section bar |
| Company Info. |
| Wuxi Yushun Metallurgical Technology Co., Ltd. |
| Verified Supplier |
| View Contact Details |
| Product List |
High Efficiency and High Precision Short Stress Rolling Mill for
Rod/Rebar Production line
Detailed specification of rolling mill equipment
1. Rolling mill layout:
-- Rolling direction: from right to left
-- Elevation of rolling line: 1066mm
-- Elevation of left drum: 500mm
-- Spacing between left and right rolls: 2×3150=6300mm
2. Main parameters of rolling mill:
| Technical parameters of tension winding machine | ||
| Tension coiler number | 2 | |
| Drive motor | DC motor | Z4-355-11 |
| Power of each motor | 200KW | |
| Number of motors per coiler | 2 | |
| Motor speed | 500/1500rpm | |
| Reduction ratio | 8.5/1 | |
| Solid drum: | Drum diameter | 508mm |
| Strip width: | 500mm | |
| Full length of drum surface | 550mm | |
| Outer diameter of steel coil: | 1500mm | |
| Tension: | Maximum tension | 110kN |
| Minimum tension | 3kN | |
| Garden disc lock brake: | Ability | 25% nominal torque |
| Action | Electrical control | |











Selling Units: Single item
Single package size: 150*100*170cm
Single gross weight: 100,000kg
Package Type: Safety Seaworthy Package
Lead Time:
| Quantity (Tons) | 1-100 | >100 |
| Est. Time(Days) | 60 | To be negotiated |
|