Sign In | Join Free | My futurenowinc.com
futurenowinc.com
Products
Search by Category
Home > Ingots >

JIS G3461 Carbon Steel Tubes For Boiler And Heat Exchanger

Categories Heat Exchanger Tubes
Brand Name: TORICH
Model Number: JIS G3461
Place of Origin: CHINA
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Delivery Time: 35-45days
Packaging Details: In wooden boxes or hexagonal bundles in seaworthy packing
Product Name: JIS G3461 Carbon Steel Tubes for Boiler and Heat Exchanger
Model No: JIS G3461
Technique: Cold Drawn
Surface Treatment: Oiled
Type: Seamless
Alloy Or Not: Not Alloy
Section Shape: Round
Application: For Boilers,Superheaters,Steam Linepipes Of Boilers
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

JIS G3461 Carbon Steel Tubes For Boiler And Heat Exchanger

JIS G3461 Carbon Steel Tubes for Boiler and Heat Exchanger

Scope:JIS G3461 Carbon Steel Tubes is mainly used for exchanging heat on the inside and outside of the tube, such as water tubes, smoke tubes, superheater tubes, air preheater tubes, etc.Its application fields are: boiler tubes, heat exchanger tubes, condenser tubes, catalyzer tubes, etc. It can also be used in chemical and petroleum industries, But it can't be used for low temperature service.


Chemical Composition:

GradeProcessChemical Composition (%)
CSiMnPSNiCrMoOthers
STB35S, E0.18Max0.35Max0.30~0.600.035Max0.035Max----
STB42S, E0.32Max0.35Max0.30~0.600.035Max0.035Max----
STB52S, E0.25Max0.35Max1.00~1.500.035Max0.035Max----

Mechanical Properties:

Symbol of classTensile strength

N/mm2

{kgf/mm2}

Yield point or proof stress
N/mm2

{kgf/mm2}

Elongation %
Outside diameter 20mm or overOutside diameter 10mm or over to and excl. 10mmOutside diameter under 10mm
No. 11 test piece No. 12 test pieceNo. 11 test pieceNo. 11 test piece
STB340

STB410

STB510

340{35}min.

410{42} min.

510{52} min.

175{18} min.

255{26} min.

295{30} min.

35 min.

25 min.

25 min.

30 min.

20 min.

20 min.

27 min.

17 min.

17 min.

Manufacture Method:

Symbol of classHeat treatment
Hot finished seamless steel tubeCold finished seamless steel tubeElectric resistance welded steel tube other than hot finished or cold finished steel tubeFinished electric resistance welded steel tubeFold finished electric resistance welded steel tube
STB 340As manufactured, as required, low temperature annealing or normalizing may be performed.Low temperature annealing, normalizing or full annealing.NormalizingAs manufactured. However, as required, low temperature annealing or normalizing may be performed.Normalizing
STB 410As manufactured. However, as required, low temperature annealing or normalizing may be performed.Low temperature annealing, normalizing or full annealing.NormalizingLow temperature annealing
STB 510Normalizing

Product Pictures:



Company Introduction:

Packaging and Delivery:


FAQ:

Q: Are you trading company or manufacturer?

A: We are a professional steel pipes materials manufacturer.


Q: How long is your delivery time?

A: Generally it takes 7-14 days if the goods are in stock or 30-60 days if there is no stock, this mainly depends on quantity.


Q: Do you provide free sampleas?

A: Yes, we could offer the sample for free charge but need pay the cost of freight.


Q: What is your terms of payment?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us.




Quality JIS G3461 Carbon Steel Tubes For Boiler And Heat Exchanger for sale
Send your message to this supplier
 
*From:
*To: TORICH INTERNATIONAL LIMITED
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0