| Sign In | Join Free | My futurenowinc.com |
|
| Categories | Nylon Extruder Machine |
|---|---|
| Place of Origin: | China |
| Brand Name: | Polywell |
| Packaging Details: | Wooden case |
| MOQ: | 1 set |
| Price: | Negotiation |
| Delivery Time: | 30-38 working days |
| Payment Terms: | T/T, Western Union, MoneyGram |
| Model Number: | PW-SJ60/70/80 |
| Certification: | SGS |
| Supply Ability: | 80 sets per month |
| speed: | 8-14cm/min for each shape |
| strip shape: | all kinds of shape |
| raw material: | 25% glass fiber reinforced PA66 granules |
| Usage: | Produce thermal break strip |
| Plastic type: | Extruder |
| Rewinder: | Available |
| Strip cutting: | Manual/semi-automatic |
| Condition: | New |
| Application: | Profile |
| Screw Design: | Single-screw |
| After-sales Service Provided: | Engineers available to service machinery overseas |
| Plastic Processed: | PA |
| Automatic Grade: | Auotmatic |
| Voltage: | 380V(customized) |
| Weight: | Around 1000kg |
| Port: | shanghai port |
| Company Info. |
| Suzhou Polywell Engineering Plastics Co.,Ltd |
| Verified Supplier |
| View Contact Details |
| Product List |
| Material | PA66GF25 |
| Production Speed | 8-14 cm/min |
| Max Output | 60-80 kg/h |
| Power | 380V,50Hz or customized |
| Water | Tap water or well water |
Extrusion is a technique where molten polymer is forced through a die and is used to produce components of a fixed cross-sectional area such as polyamide thermal break profiles.
The plastic extrusion process begins when PA compounds in the form granules are continuously fed through a hopper into the extruder. The screw gradually moves these materials along the barrel, and in the process, enough heat is generated to melt the PA compounds.






-We can make good quality strips moulds, including the complicated moulds.
Strip quantity from 20-120 pcs.
Strip shape from I type, C type, T type, CT type Hollow type etc.
-We can supply the whole production line, including raw material,
Parallel twin-screw granulator and the extruding machine of thermal
barrier strip.


Production Time
30-38 working days after receiving the deposit
Payment
50% T/T before production, 50%T/T before shipment
Our Factory

Please feel free to contact us if you have any questions.
|