| Sign In | Join Free | My futurenowinc.com |
|
| Categories | Battery Transfer Cart |
|---|---|
| Place of Origin: | Xinxiang |
| Brand Name: | BEFANBY |
| Model Number: | KPX-20T |
| Certification: | CE,SGS,ISO9001 |
| Price: | Negotiation |
| Packaging Details: | Electrical parts will add shields. As required by the customer, we can add a fixed packing. |
| Delivery Time: | 50-60 days as usual delivery,40-50days for urgent delivery |
| Payment Terms: | 30% deposit by T/T in advance, 70%balance by T/T before dispatch |
| Supply Ability: | 600 sets one year |
| MOQ: | 1 set min order |
| Shipment port: | Qingdao/Tianjin/Shanghai |
| Material: | Steel |
| Power supply mode: | Battery |
| Electricl equipments: | Siemens, Schneider, Nord |
| Exported countries: | Holland, Singapore, Germany, Mexico |
| Application: | For material transport |
| Features: | Workshop use |
| Car size: | Customized |
| Capacity: | Up to 300ton |
| Control mathod: | Push button pendant or remote control |
| Certificate: | CE,SGS,ISO9001 |
| Company Info. |
| Xinxiang Hundred Percent Electrical and Mechanical Co.,Ltd |
| Verified Supplier |
| View Contact Details |
| Product List |
KPX-20T workshop equipment as materials rail transporter
Working principle
KPX series workshop equipments are battery powered. The batteries
are installed in the carts. The batteries supply electricity to the
DC motor through the electrical control system. Then the reducer
drives the wheels of the flat carts start, stop, go forward and
backward, and the speed can be adjusted at the same time. The
professional charger can give electricity to the battery when the
battery is no power.
Main components
Cart frame, cart wheels,DC electric motor, gear reducer, battery,
charger, electrical appliance box, push button pendant, remote
controller,alarm light
Usage
a.it is used to transfer materials in workshop
b.it can walk on turning railways
c.it is suitable to the high tempareture and flammable environments
d.DC motor
e.low using frequency
f. no strict requirements for the railway construction
g.unlimited using time



|