| Sign In | Join Free | My futurenowinc.com |
|
| Categories | Aluminium Die Casting Parts |
|---|---|
| Brand Name: | UKD |
| Model Number: | 550*120 |
| Certification: | IATF16949 |
| Place of Origin: | American |
| MOQ: | 100 pieces |
| Price: | dollar 5-6 per piece |
| Payment Terms: | L/C, D/A, D/P, T/T |
| Supply Ability: | 5000000 pieces per year |
| Delivery Time: | 5-8 weeks |
| Packaging Details: | wood box |
| Material: | Aluminum 6061 |
| process: | lost wax investment casting |
| surface treatment: | black Painting |
| service: | OEM ODM, manufacturer |
| Weight: | 1.6KG |
| Company Info. |
| Qingdao UKD Machinery Co., Ltd. |
| View Contact Details |
| Product List |
Aluminium Die Casting Products Connector Frame Of Boat 550*120 Mold
The Product description
| Basic parameter | length | W | H |
| 555 | 12· | 100 | |
| Weight (kg) | 1.61 | ||
| Casting method | metal casting, gravity casting | ||
| major Process | casting+ CNC machining+package | ||
| Machining tolerance | +-0.01 | ||
| Surface Roughness | Ra3.2 | ||
| treatment of Surface | black painting | ||
| Adapt | boat | ||
| Protection mathods | carton cage | ||
| related filed | equipments | ||
Photos of the parts


FAQ
1. Are you a factory or a trading company?
Qingdao UKD Machinery Co., Ltd. is a professional factory of casting parts , centrifugal pump parts,
submersible pump parts, mining equipments and Auto parts etc.
2. Can I be your agent?
Yes, welcome to deep cooperation.
3. How do we retain client confidentiality?
We are happy to sign Confidentiality Agreements with customers and
will honor them.
4. Which languages do we do business in?
Although we do business with many countries around the world, we
can only communicate effectively in Chinese and English.
All information supplied should therefore be supplied in this form.
5. How long does it take to receive samples?
a) Pattern:30-45days after order
b) Sample:30days after pattern finishing.
c) The lead time is the general production period and not include
the transportation time.
6. New product development process
Got tooling order and sample order with 50% deposit---Hold a
meeting with the relation dept. to confirm the developing
schedule---Prepare Prototype and sending for confirmation, fixture
and gauge and making them in our house---mold steel
buying---Machining---Inspection---Send out the tooling sample with
initial inspection report.
>
>
|