Sign In | Join Free | My futurenowinc.com
futurenowinc.com
Products
Search by Category
Home > Electricity Generation >

Low Head Pipe Installation Tubular Hydro Turbine 20kw To160kw For Hydro Power Plant

Categories Tubular Turbine Generator
Brand Name: Forster
Model Number: GL-T03-40
Certification: CE/TUV/ISO9001/From-E
Place of Origin: Sichuan, China (Mainland)
MOQ: 1 Set/Sets
Price: USD12100-52000/set
Payment Terms: L/C, T/T, Western Union
Supply Ability: 30set/month
Delivery Time: 90days
Packaging Details: wooden box
Water Head: 4-16m
Flow Rate: 0.25-1.3m3/s
Application: Low head area
Frequency: 50Hz/60Hz
Voltage: 220v,380v,400v
Generator type: Brushless Excitation
Excitation device: Integrated control panel
Speed control function: Active guide vane speed
Keyword: tubular turbine
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

Low Head Pipe Installation Tubular Hydro Turbine 20kw To160kw For Hydro Power Plant

Hydroelectric Energy Market Low Head Pipe Installation 20kw to160kw Tubular Hydro Turbine For Hydro Power Plant

Our main products included:

1. Kaplan turbine generators series.

2. Turgo turbine generators series,e.g. vertical type horizontal type.

3. Tubular turbine generators series ,e.g. Bulb type and shaft extension type.

4. Francis turbine generators series.

5. Pelton turbine generators series and double turbine generators series and so on.

6. Other auxiliary equipment for hydropower station, such as generator, control panel, governor, valve, transformer, automatic electrical equipment, electricity meter, pressure tube, etc

750

Product features:


1, Power station from water to water direction is basically the axial direction penetration.such as bulb turbine hydropower station of the feed water control and outlet pipe bend, simple shape, the path of circulation of hydraulic damage reduction,convenient construction .

2, Tubular turbine has high flow ability and larger specific speed, so when the head and power are under the same conditions,tubular turbine diameter is about 10% smaller than Turn to paddle


3, Hydro-power unit structure is compact,compared with the same specifications of paddle unit,Its size is small,and it can be decorated in dam body,cancel the complex diversionsystem,reduce the construction area of factory building,reduce the excavated volume and the amount of concrete,according to the relevant data analysis,construction cost can be saved 20%-30%.

4, Tubular turbine work for reversible pump turbine running, due to the in and out of the water without a sharp turn working condition of pump and the turbine can get a better hydraulic performance.Such as tidal power station can be two way with applications in power generation,pumping,drainage and other three kinds of functions.Therefore,it is suitable for comprehensive exploitation and utilization of low head hydraulic resource.

5, Hydro-power is short in construction period, and results fast generally than vertical axial-flow hydro-power station .


Product parameters:

T03-40 Hydro tubular turbine performance data and supporting table
ModelTurbine ParametersGenerator ParametersDriving modeSpeed WayWater Intake
Design head(m)Under the design headDesign speed (r/min)The power of generatorRated speed(r/min)Vavel controlGuide vane controlDiameter (mm)
Flow rate (m3/s)The output(kw)
T03-4040.642175020750direct connection500
4.50.682579525750
50.722983925750
5.50.753487930750
60.7838919351000
6.50.8243956401000
70.8548992451000
7.50.88541027501000
80.91591061551000
8.50.93651093601000
90.96701125701000
9.50.99761156751000
101.01821186801000
10.51.04891215851000
111.06951244901000
11.51.0910212721001000
121.1110812991051000
12.51.1311513261101500
131.1512213521201500
13.51.1812913781251500
141.213614031351500
14.51.2214414281451500
151.2415114521501500
15.51.2615914761551500
161.2816715001651500

Product pictures:

Product drawing:



Other products

Company Information

Our workshop

Advantages

Engineering Case

Packaging & Shipping

FAQ

Q1, Which turbine should I choose?

Please tell me the water head, flow rate, frequency, Total power you need

, voltage, on grid or off grid operation, we will propose a solution.

Q2, Can your factory provide all the equipment for hydropower generation?

Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

Q3, Can you do EPC for a hydroelectric power plant?

Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

Q4, Is your company a trading company or a manufacturer?

We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

Q5, What is an acceptable MOQ?

For this product, our acceptable MOQ is 1 set.

Q6, How long is the delivery time?

Delivery times range from 15 days to 6 months depending on the model you are purchasing.

Q7, Does your company have its own independent official website?

Of course, and we can see more information about our company and products on our official website. website address: www.fstgenerator.com


Quality Low Head Pipe Installation Tubular Hydro Turbine 20kw To160kw For Hydro Power Plant for sale
Send your message to this supplier
 
*From:
*To: Chengdu Forster Technology Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0