| Sign In | Join Free | My futurenowinc.com |
|
| Categories | Cable Tray Roll Forming Machine |
|---|---|
| Brand Name: | Saibo |
| Model Number: | Difference size |
| Certification: | CE/IS09001/SGS |
| Place of Origin: | China |
| MOQ: | 1 set |
| Price: | negotiable |
| Payment Terms: | L/C, T/T, Western Union |
| Supply Ability: | 280 sets per year |
| Delivery Time: | 65 working days after received deposit |
| Packaging Details: | Suitable for ocean shipment |
| Product Name: | Metal Tray Production Line |
| Usage: | Building |
| Steel thickness: | 0.55-1.5mm |
| Power: | 15KW+5.5KW |
| Roller material: | Gcr15, surface with chrome, HRC58-62 degree |
| Station: | 21 stations |
| Drive system: | By chain |
| Shaft: | ¢70mm |
Metal Tray Production Line
1. Profile drawing:
Size 1: 50x50mm

Size2: 600x50/80/100mm

Size3: cover


| No | Specification of the material | |
| 1 | Suitable Material | Zink Steel, 0.55-1.5mm, steel grade: 220-320Mpa Stainless steel ,0.55mm-0.8 mm |
| 2 | Width of the raw material | ≤850 mm |
| 3 | Thickness | Zink Steel, 0.55-1.5mm Stainless steel ,0.55mm-0.8 mm |
2. Machine Detailed Parameters:
| 1 | Machine structure | Wire electrode cutting structure |
| 2 | Change size | By hand wheel |
| 3 | Total power | Main Power: 15KW Hydraulic Power: 5.5kw |
| 4 | Roller stations | About 21 stations |
| 5 | Forming speed | 0-15m/min |
| 6 | Drive system | By Chain |
| 7 | Diameter of shaft | ¢70mm solid shaft |
| 8 | Voltage | 380V 50Hz 3phases |
3. The Chart of Process Flow

5T hydraulic de-coiler—flatten—servo feeding& Punching—Servo Feeding& punching& cutting—motorized conveyor—roll forming—out table
4. Specification of Components
| No | Technical Specification & Remark | |
| 1 | 5T Hydraulic un-coiler
|
|
| 2 | Flatten
|
|
| 3 | Servo feeding& punching machine
| Servo machine:
Punching machine: Description:
Technology details of punching machine:
|
| 4 | Servo feeding& hydraulic punching& cutting
|
|
| 5 | Motorized conveyor
|
|
| 6 | Main roll forming machine
|
|
| 7 | Machine structure:
|
|
| 8 | Hydraulic System
|
|
| 9 | Computer Control Cabinet
|
|
| 10 | Out table
|
|
| 11 | Spare Parts
|
|
5. Packing & Delivery
6. Warranty
1: Guaranteed against malfunctions due to manufacturing defects for 1 year after date of shipment. Repairs will be made free of charge.
2: Repairs will not be performed free of change even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
3: Air ticket, transportation cost, hotel, meals and 100USD per day shall be for purchaser’s account if manufacturer’s engineer has to be for installation new machine.
7. Payment Term
30% deposit by T/T in advance and 70% balance after inspection confirmation before shipment
|