| Sign In | Join Free | My futurenowinc.com | 
 | 
| Categories | Steel Structure Workshop | 
|---|---|
| Brand Name: | Homeshore | 
| Model Number: | CAGJG-003 | 
| Certification: | ISO9001 | 
| Place of Origin: | China | 
| MOQ: | 1 square meters | 
| Price: | Negotiation | 
| Payment Terms: | T/T, Western Union,, L/C | 
| Supply Ability: | 1500 ton per Month | 
| Delivery Time: | 20-30 working days | 
| Packaging Details: | Wooden bar, Cable Strip, Pallet, Wooden Box, etc. | 
| Color: | Customized | 
| Place of origin: | Qingdao, China | 
| Frame Material: | Q345 Q235 | 
| Window: | PVC Sliding windows/ Al-alloy windows | 
| Floor Board: | Plywood board/ PVC leather floor. | 
| Size: | As Custom requirement | 
Multi Floors Steel Structure Building Prefabricated Steel Structure Workshop
Main Materials of Prefabricated Building Stable Structure Warehouse Steel Structure
Workshop
| Standard: | AISI, ASTM, BS, DIN, GB, JIS. | ||
| Place of origin: | QINGDAO China | ||
| Brand name: | Homeshore | ||
| Connection: | high strength bolt | ||
| Surface treatment: | galvanized or painted | ||
| Door: | sliding door or rolling door. | ||
| Windows | PVC window or aluminium window. | ||
| Coated steel panel | coated steel panel, sandwich panel&glass insulation pad + steel
wire mesh | ||
| Application: | warehouse workshop plant | ||
| Color: | customer required | ||
| Performance: | safety, water-proof, sound insulated hear-preservation ect. | ||
| Dimension: | customers' requirements. | ||
| Material: | Q235 Q345 &Q345B steel | ||
| Purlin: | galvanized C/Z section steel. | ||


General fabrication main process of steel structure is divided into: material preparation →cutting→ assembling→ welding→ drilling → assembly → correction → shot blasting and rust removal → painting → number →component acceptance ex-factory. In the steel structure production, according to the steel structure production process flow, grasp the key processes for quality control, such as control of key parts processing, main components of the process, measures, processing equipment, process equipment, etc. Each processing part, we can have strict inspection specifications. Welding engineering is the most important link in steel structure fabrication and installation engineering.
For the welding, We have our qualified CWI welding inspector to control the quality according to AWS-D1.1/D1.5 welding quality system. Spot welding strictly weld according to ASW welding quality system.
Packing Materials&Loading:
Packing materials:
Bottom steel rack
Cable wire
Timber
Packing straps
Wooden box
Carton box, etc.
Loading & unloading:
Use 2-3 forklifts to lift the package up and pushed slowly by the
end forklift into the 40'GP/40'HC/40'OT containers. The unloading
is the same.
|   | 
 Welding Industrial Steel Frame , Light Steel House Construction Warehouse
                                                                                    
                        
                        
                        
                                                            Welding Industrial Steel Frame , Light Steel House Construction Warehouse
                                                    
                        
                     Light Structural Steel Frame Construction , Self Build Steel Garages With Sliding / Rolling Door
                                                                                    
                        
                        
                        
                                                            Light Structural Steel Frame Construction , Self Build Steel Garages With Sliding / Rolling Door
                                                    
                        
                     Prefab Industrial Steel Structure Workshop C Type Frame For Factory Building
                                                                                    
                        
                        
                        
                                                            Prefab Industrial Steel Structure Workshop C Type Frame For Factory Building
                                                    
                        
                     Hot Rolled Steel Structure Workshop High Grade Wind Resistance Quick Installation
                                                                                    
                        
                        
                        
                                                            Hot Rolled Steel Structure Workshop High Grade Wind Resistance Quick Installation
                                                    
                        
                     Stable Light Steel Frame Construction , Metal Frame Steel Building House
                                                                                    
                        
                        
                        
                                                            Stable Light Steel Frame Construction , Metal Frame Steel Building House
                                                    
                        
                     Movable Steel Structure Workshop / Car Garage HDP / Painted Easy Installation
                                                                                    
                        
                        
                        
                                                            Movable Steel Structure Workshop / Car Garage HDP / Painted Easy Installation
                                                    
                        
                     Movable Prefabricated Steel House , Pre Engineered Steel Portal Frame House
                                                                                    
                        
                        
                        
                                                            Movable Prefabricated Steel House , Pre Engineered Steel Portal Frame House
                                                    
                        
                     Stable 60 X 30 Steel Frame Buildings , High Precision Prefab Steel Frame
                                                                                    
                        
                        
                        
                                                            Stable 60 X 30 Steel Frame Buildings , High Precision Prefab Steel Frame
                                                    
                        
                     Powder Coated Steel Structure Workshop Prefab For Industry 50 Years Warranty
                                                                                    
                        
                        
                        
                                                            Powder Coated Steel Structure Workshop Prefab For Industry 50 Years Warranty
                                                    
                        
                     Sandwich Panel Steel Portal Frame Building , Steel Shop Buildings With Sliding Door
                                                                                    
                        
                        
                        
                                                            Sandwich Panel Steel Portal Frame Building , Steel Shop Buildings With Sliding Door