| Sign In | Join Free | My futurenowinc.com | 
              
  | 
      
| Categories | Billet CCM | 
|---|---|
| Place of Origin: | Jiangsu Wuxi China (mainland) | 
| Brand Name: | Haijun | 
| Model Number: | R6M,R8,R10 | 
| Product size: | 140×1000 ~ 200×1400 | 
| Annual production: | 50,0000 ~ 1,000,000Ton | 
| MOQ: | 1 Set | 
| Packaging Details: | Container | 
| Delivery Time: | 10 months | 
| Payment Terms: | T/T , L/C | 
| Supply Ability: | 3 strands CCM per year | 
| Certification: | ISO9001-2008 | 
| Price: | Negotiable | 
| Condition: | New | 
| Dimension(L*W*H): | 150Square | 
| Warranty: | 1 years | 
| technic: | import German technic and OEM factory | 
| Voltage: | 120kw | 
1 / 2 Strand Casting Slabs R6m , R8m , R10m Ladle Turret
Quick Detail:
radius: R6M, R8M, R10M
Strand number :1 / 2 strands
advanced design
safe operation
Low energy and high efficiency
We can produce high quality continuous casting machines from 1 to 8 strands with the lowest equipment manufacturing cost.We can design, manufacture the up-to-date billet continuous casting machine in accordance with the user's steelmaking capacity, billet size, steel grades and the user's field conditions.
Description:
1. Basic standby technical parameters:
Steel billet casting machine radius  | 6m,8m,10m  | 
Strand quantity  | 1,2 strands  | 
Ladle support type  | Ladle turret  | 
Tundish carriage  | Semi-portal, cross sliding function  | 
Casting method  | Metering nozzle, closed casting  | 
Secondary cooling  | Aerosol cooling , 3 adjusting circuit  | 
Withdrawal straightening machine  | Totally 5 roller, progressive straightening  | 
Roll table  | Chain group centralized drive  | 
Dummy bar  | Flexible chain dummy bar  | 
Billet cutting  | Hydraulic or flame cutting machine  | 
Billet conveying  | Group centralized live roller table  | 
Cooling bank type  | Step cooling bed  | 
2. Technical process description and capacity of steel billet CCM
Induction furnace:
Nominal capacity  | 70T  | 
Tap-to-tap cycle  | 60min  | 
Furnace quantity  | 1set  | 
Production capacity
Working days  | 330 days/year  | 
Average number of daily furnace  | 24/day  | 
Annual production:  | 50,0000 ~ 1,000,000Ton  | 
3. Casting speed, productivity and strand quantity
The calculation results is the ideal state of the production, please according to own actual situation of adjustment.
Steel grade  | Casting grade(m/min)  | Effective deformation rate(ε)  | Allowable deformation rate(εmax)  | 
Straight carbon steel  | 0.8~1.8  | Please refer to the computational table  | 0.25  | 
Low alloy steel  | 0.8~1.65  | Please refer to the computational table  | 0.15~0.2  | 
4. CCM equipment parts list
No.  | Equipment name  | Weight  | Type  | unit  | Quantity  | |
Ⅰ  | Equipment body  | |||||
1  | 
  | 107T  | Signer arm load 100T, with cover, with lifting device  | set  | 1  | |
2  | Steel water weighing system  | set  | 2  | |||
3  | Rotary arm lift hydraulic system  | 4T  | 
  | set  | 1  | |
4  | Protection tube device  | 1T  | set  | 1  | ||
5  | Rotary accident tank  | 2T  | set  | 1  | ||
6  | 
  | 18×2=36T  | 
  | set  | 2  | |
7  | 
  | 4.5×2=9T  | 
  | pcs  | 2  | |
8  | 
  | 4.5×2=9T  | 
  | set  | 2  | |
9  | Protection tube  | 0.35  | set  | 1  | ||
10  | Tundish cover  | 4.8T  | 
  | set  | 2  | |
11  | Tundish open cast-on system  | set  | 5  | |||
12  | Stopper Control System  | set  | 2  | |||
13  | Accident flow slag tank  | 1.2T  | pcs  | 2  | ||
14  | 
  | 11×3=33T  | 140×1000  | set  | 3  | |
15  | Vibration device  | 24×2=48T  | 
  | set  | 2  | |
16  | 
  | 12×2=24T  | 
  | set  | 2  | |
17  | 
  | 16×2=32T  | 
  | set  | 2  | |
18  | Sector straightening and withdrawal section  | 23×8=184T  | 
  | set  | 8  | |
19  | Secondary cooling sector base  | 64×2=128T  | set  | 2  | ||
20  | Quick guide  | 32T  | 
  | set  | 1  | |
21  | Straightening and withdrawal drive device  | 1.8×4=7.2T  | set  | 4  | ||
22  | Aerosol spray device  | 6×2=12T  | set  | 12  | ||
23  | Take Off the dummy bar device  | 1×2=2T  | set  | 1  | ||
24  | Flexible dummy bar  | 13T  | 42Cr  | set  | 1  | |
25  | Flame cutterⅠ  | 13T  | set  | 1  | ||
26  | Hydrogen and oxygen generator  | set  | 2  | |||
27  | Traverse roller  | 26T  | set  | 1  | ||
28  | Dummy bar storage device  | 30T  | set  | 1  | ||
29  | Roller table  | 37×1.5=55T  | set  | 37  | ||
30  | Flame cutter Ⅱ  | 6T  | set  | 1  | ||
31  | Hydrogen and oxygen generator  | set  | 1  | |||
32  | Steel delivering machine  | 22T  | set  | 1  | ||
33  | Straightening and withdrawal hydraulic station  | 10T  | set  | 1  | ||
34  | Straightening and withdrawal hydraulic cylinder  | set  | 10  | |||
35  | Mould water distribution system  | set  | 1  | |||
36  | 0 section r water distribution system  | set  | 1  | |||
37  | Ⅰsection water distribution system  | set  | 1  | |||
38  | Ⅱsection water distribution system  | set  | 1  | |||
39  | Straightening and withdrawal Ⅰsection water distribution system  | set  | 1  | |||
40  | Straightening and withdrawal Ⅱsection water distribution system  | set  | 1  | |||
41  | Turret lubrication system  | set  | 1  | |||
42  | Tundish lubrication system  | set  | 1  | |||
43  | Vibration lubrication system  | set  | 1  | |||
44  | Secondary cooling 0~Ⅱsection  | set  | 3  | |||
45  | Straightening and withdrawal lubrication system  | set  | 4  | |||
46  | Roller lubrication system  | set  | 4  | |||
47  | Steel delivering machine  | set  | 1  | |||
48  | Gas source and treatment system  | |||||
Ⅱ  | Gas source and treatment system  | |||||
1  | Air compressor for aerosol cooling  | 12×3=36T  | 60M/min  | set  | 3  | |
2  | Gas bag  | 6×2=12T  | set  | 2  | ||
3  | Compressed air piping in workshop  | 9T  | set  | |||
4  | Instrument air compressor  | 2.3×2=4.6T  | set  | 2  | ||
5  | Gas source and treatment system  | 8T  | set  | 1  | ||
6  | Gas bag  | 1.5T  | set  | 1  | ||
                                 
                             |