| Sign In | Join Free | My futurenowinc.com |
|
| Categories | Wire Extrusion Machine |
|---|---|
| Brand Name: | HOOHA |
| Model Number: | 65 |
| Certification: | CE |
| Place of Origin: | China |
| MOQ: | 1 |
| Price: | Negotiable |
| Payment Terms: | L/C, T/T |
| Supply Ability: | 5 units per month |
| Delivery Time: | 25 working days |
| Packaging Details: | PE foam ,wooden package |
| Single wire: | 1 layer |
| material: | silicone gel |
| finish od available: | 1.5mm-8mm |
| market: | India, Egypt |
| voltage: | 380v |
| electricity brand: | Siemens |
| technical support: | yes |
| workers for the production line: | 2 |
| machine weight: | 6500 KG |
| technician: | flexible passport to oversea |
| line speed: | 70-120 m/min |
Highly Speed Wire Extrusion Machine Silicone Cables And Wires Production
Application
It is for Silicne gel to extrude for silicone cable / wire and silicone hose .
it can match with Horizontal silicone extruder to produce two color silicone cable .
line speed is about 80-120 m/min in our local market . we accept ODM for different market customer request.
| Parameters | 45 | 65 | 80 | 90 | 115 |
| Finished diameter | 0.8-4.0mm | 1.2-8mm | 2.0-16mm | 3.0-25mm | 8.0-50mm |
| Line speed (max.) | 130m/min | 100m/min | 100m/min | 70m/min | 40m/min |
| Extrusion output (max.) | 40kg/h | 90 kg/h | 150 kg/h | 200 kg/h | 300 kg/h |
| L/D | 12:1 | 12:1 | 12:1 | 12:1 | 8-12:1 |
| Extruder power | 7.5KW | 11KW | 22KW | 30KW | 55KW |
| Payoff reel | PN400-630 | PN400-630 | PN500-1000 | PN630-1250 | PN800-1600 |
| Curing length | 16m | 16m | 24m | 24m | 32m |
| Capstan power | 3.7KW | 5.5KW | 5.5KW | 7.5KW | 11KW |
| Take-up reel | PN400-630 | PN400-630 | PN500-1000 | PN630-1250 | PN1000-2000 |



Spare Parts Brands
Motor:Siemens
Inverter :Japan Yaskawa, Siemens
Temperature Control Meter:Japan RKC;
Auxiliary Relay:Japan Omron ;
Ammeter and Voltmeter:Taiwan Risesun ;
Indicator, Switch and Button:Taiwan TEND ;
Contactor:Taiwan Shihlin
Line Speed Meter:Taiwan FOTEK/Yangming
Bearing :NSK, SKF
Afetr service
1).Delivery dates:25 working days
2).Payment:TT or L/C
3).Packing:Wood packing and PE plastic packing ensure the goods
safety on the transportation.
4).Install and training service:2 professional engineers who has
over 5 years overseas install and cable manufacture training
experience.
5) after service phone number online


|
|