| Sign In | Join Free | My futurenowinc.com |
|
| Categories | Silo Roll Forming Machine |
|---|---|
| Brand Name: | Saibo |
| Model Number: | YX40-160-1120 |
| Certification: | CE/ISO |
| Place of Origin: | China |
| MOQ: | 1 set |
| Price: | negotiation |
| Payment Terms: | L/C, T/T |
| Supply Ability: | 300 sets per year |
| Delivery Time: | 90 days |
| Packaging Details: | Suitable for ocean shipment |
| Product Name: | Silo roll forming machine |
| Power: | 110KW+30KW |
| Size Of purlin: | YX40-160-1120 |
| Steel thickness: | 3.0-6.0mm |
| Decoiler: | 10t hydraulic |
| Station: | 20 stations |
| Roller material: | Gcr15 with chrome treatment |
| Drive: | Gear box |
3 - 6mm thickness Silo Roll Forming Machine with hydraulic Decoiler
Main speficication:
| No | Specification of the material | |
1 | Suitable Material | Galvanized steel |
2 | Width of the raw material | Based on the purlin sizes. |
| 3 | Thickness | 3.0-6.0mm |
Profile:

Main photo for reference

The Chart of Process Flow
De-coiler →Hydraulic press and leveling device→ Feeding→roll forming→track punching and stop cutting→transportation table→curving→end product
Specification of components
| No | Technical Specification & Remark | |
| 1 | 10T Hydraulic de-coiler |
|
| 2 | Hydraulic press and leveling device |
|
| 3 | Roll forming |
|
| 4 | Track Punching system |
|
| 5 | Hydraulic cutting |
|
| 6 | Transmission table |
|
| 7 | Curving machine |
|
| 8 | Hydraulic station |
|
| 9 | Control panel system |
|
Warranty
1: Guaranteed against malfunctions due to manufacturing defects for 1 year after date of shipment. Repairs will be made free of charge.
2: Repairs will not be performed free of change even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
3:Air ticket, transportation cost, hotel, meals and 100$ per day shall be for purchaser’s account if manufacturer’s engineer has to be send to purchaser’s factory to maintain the machine during the guarantee period.
|