Sign In | Join Free | My futurenowinc.com
futurenowinc.com
Products
Search by Category
Home > Optoelectronic Displays >

Long Leads Liquid Ceramic Resistor Heater PTC Environmental Protection

Categories PTC Water Heater
Brand Name: Hwalon
Model Number: PR4
Certification: CE/RoHS/CE/VDE
Place of Origin: China
MOQ: 100pcs
Price: negotiation
Payment Terms: T/T, Western Union
Supply Ability: 10,000pcs per month
Delivery Time: 25 working days after received your payment
Packaging Details: Standard CTN package or according to customer’s requirement
Lead dia.: customized
Strong point: can be used in water
Power: 20W~2000W
Operating voltage: 6V~240V
Surface temp.: 80℃~290℃
Insulation voltage: > 3750V
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

Long Leads Liquid Ceramic Resistor Heater PTC Environmental Protection

Long Leads Liquid Ceramic Resistor Heater PTC Environmental Protection


Feature
1. With charcteristics of constant temperature
2. PTC hearter does not require temperature controlling system
3. It is safe when liquid is burnt out in liquid heating device
4. Not sensitive to voltage fluctuating
5. Wide operating voltage
6. Restore automatically after invalidation

How to Order:

In order to help you to get the exact model, please offer the following necessary info.:

1.Application of the PTC Heater pills:__________

2.Size of the PTC Heater pills:__________mm

3.Environment Tempeture:________ °c

4.Surface electrode : Silver or Aluminium

5.R value(25 °c):_____ ohm ±________%

6.Surfact Tempeture: ________ °c

7.Operating Voltage: ________ V

* Fill " * " items necessarily


Description:

1. submerged liquid heater application design

This is a submerged liquid heating (T-type PTC heater), the heater probe into the liquid container is heated, the liquid to obtain a constant temperature. PTC element used as the heat source, with fast heating, heat thermostat, self-adjusting power, heat conversion rate, anti-scale ability, even if no damage and so dry. It is widely used in various types of electric appliances in the home appliance industry.

Embedded liquid heater technology parameters:

Operating voltage: 6V-240V

Insulation voltage:> 3750V, through special insulation treatment, safe and reliable

Surface temperature: 100 ℃ ~ 290 ℃

Rated power: 20W ~ 800W

2. fluid liquid heater application design

This is a fluid liquid heater (also called foot tub with a tubular heater PTC), our company is for the foot bath product launch another product, mainly used in high-end to the cycle of heating foot bath products above, with the use of easy installation, long life, easily damaged and other traditional heating materials (for example: quartz glass) unmatched features. Further dimensions can be customized to customer's actual installation size, product quality in a leading position in the peer.

Fluid liquid heater technical parameters:

Operating voltage: 6V-240V

Insulation voltage:> 3750V, through special insulation treatment, safe and reliable

Surface temperature: 80 ℃ ~ 290 ℃

Rated power: 20W ~ 2000W


Applications:


ApplicationFoot tub, home appliance industry of electric appliances

Competitive Advantage:

1. Leak-proof, excellent insulating property

2. High power

3. Safety and reliability

4. OEM for your design

5. Stable performance


Specifications:


Operating voltageInsulation voltageSurface temperatureRated power
Embedded liquid heater6V-240V> 3750V100 ℃ ~ 290 ℃20W ~ 800W
Fluid liquid heater6V-240V> 3750V80 ℃ ~ 290 ℃20W ~ 2000W

Home Appliance Equipment PTC Water Heater with Long Leads Design



Any question occurred,please do not hesitate to get in touch with us.We will surely help you heart and soul.


We are looking forward to establishing long-term friendly business relationship with you.


Quality Long Leads Liquid Ceramic Resistor Heater PTC Environmental Protection for sale
Send your message to this supplier
 
*From:
*To: Shenzhen Hwalon Electronic Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0