| Sign In | Join Free | My futurenowinc.com |
|
| Categories | PE Valve Bags |
|---|---|
| Brand Name: | SINOPACK |
| Model Number: | SI-15018V |
| Certification: | SGS/CPTC |
| Place of Origin: | CHINA |
| MOQ: | 20k |
| Price: | negotiation |
| Delivery Time: | 25-45days |
| Packaging Details: | on pallets |
| Product name: | PE valve bags automatically close itself |
| material: | PE |
| print: | with printing |
| surface: | anti slide |
| air discharge: | with perforated holes |
| capacity: | 15kg, 25kg, 50kg |
| Company Info. |
| SINOPACK INDUSTRIES LTD |
| Verified Supplier |
| View Contact Details |
| Product List |
PE valve bag automatically close itself for chemical industrial use
Description:
1. PE valve bags are widely used for packing pulverous or granular material such as chemical, fertilizers,
synthetic materials, dynamite, foodstuff, salt, sugar, minerals and cement.
2.Advantage: Unique style, hardness packaging, strong stereoscopic sensation, sunlight proof, dropping and falling resistance, high-grade.
After filled, it shows its unique charm after being filled with material.
3. PE bags with valve are categorized for three types.
4. Process of closure:
----Inner short valve bags

----Outer valve bags

Packing & Loading:

Specifications:
Item | PE valve bags |
Shape | Tube, Side-gusset, Block-bottom, |
Capacity | Up to 110LBS |
Width | 13’’ – 31’’ |
Height | As per request |
Color | White, as per request |
Material | 100% virgin polyethylene, Anti-slip treatment can be done on the surface, Perforated holes on the surface, |
Top | Open top, Block with valve |
Bottom | Gusset + bottom sealed, Block bottom, |
Printing | Up to 6 colors, With BOPP film printing, |
Usage | widely for packing pulverous or granular material such as chemical fertilizers, synthetic materials, dynamite, foodstuff, salt, sugar, minerals and cement |
Advantage | Unique style, hardness packaging, strong stereoscopic sensation, sunlight proof, dropping and falling resistance, high-grade. After filled, it shows its unique charm after being filled with material. |
Packing | Packed on pallets or bale packing, 20pallets/20'FCL, 44pallets/40'FCL |
Lead time | 25days for 1 x 20'FCL; 45days for 1 x 40'FCL |
|