| Sign In | Join Free | My futurenowinc.com |
|
| Categories | Playground Shock Pad |
|---|---|
| Brand Name: | TAIHUI |
| Certification: | FIFA |
| Place of Origin: | CHINA |
| MOQ: | 500~1000 sqms |
| Price: | by negotiation |
| Payment Terms: | L/C,T/T |
| Supply Ability: | 300,000sqms per month |
| Delivery Time: | 7-10days after we receive deposit |
| Packaging Details: | Packed in rolls in PE bags |
| Maintenance Free: | Yes |
| Installation Method: | Roll out and cut to size |
| Water Absorption: | Less than 1% |
| Waterproof: | Yes |
| Structure: | Three layers with film on the backing |
| Compatible With: | Soccer/Rugby/Hockey Field |
| Piece: | 1*2m |
| Drainage Holes: | Yes |
| Tensile Strength: | >20 MPa |
| Weather Resistance: | Yes |
| Colour: | Any |
| Material: | Polyethylene foam |
| Water Drainage: | >3000 mm/hr |
| Company Info. |
| CHANGZHOU TAIHUI SPORTS MATERIAL CO.,LTD |
| Verified Supplier |
| View Contact Details |
| Product List |
1.Product Description
| Product Name | Interlocking shock pad/puzzle pad |
| Density | 30,50,70kg/m3 |
| Thickness | 30,50,70mm |
| Package | pieces in PE bags |
| Standard Size | L2.00m*W1.02m |
| Effective Size | L1.96m*W0.98m |

2. Factory Photo and Project Show



About us
Changzhou Tahui Sports Material Co., Ltd., located in Changzhou
City Wujin High-Tech Development Zone, is a high-tech enterprise
dedicated to the R&D and sales of polymer materials. The
company has a professional technical team and strong research and
development capabilities, supported by collaborations with Sichuan
University and Changzhou University Town, establishing strong
school-enterprise cooperation relations.
We always adhere to the belief that product quality is the best
solution. Now, more than ever, we prioritize innovation to provide
customers with the highest-quality service.
With the rapid development of the sports industry in recent years,
the artificial turf industry has also made significant progress. As
quality requirements for products continue to rise, existing
solutions no longer fully meet market demands. In response,
environmentally friendly elastic infill granules and shock pads
have emerged as advanced solutions.

FAQ
Q: What is your lead time?
A: about 7-10 days after we receive deposit.
Q: What are your terms of delivery?
A: FOB,CIF,etc.You can choose the most convenient one for you.
Q: What is the payment way?
A: TT, L/C
|