The SANY C10 Series Concrete Pump Truck is an equipment developed
by SANY Heavy Industry to meet the needs of efficient and precise
construction. Integrating advanced technologies, it enables long -
distance and high - precision concrete delivery, facilitating
efficient operations in various construction projects. With
reliable performance and excellent performance in the industry, it
has become the first choice for many construction parties.
Equipped with a high - performance pumping system, it has stable
concrete output and large displacement, which can quickly complete
the pouring operation and improve the construction progress,
suitable for large - scale continuous pouring scenarios. For
example, in the pouring of the foundation raft of high - rise
buildings, it can efficiently deliver concrete and reduce
construction time.
With an advanced boom design, multiple booms cooperate with each
other, with high precision and flexibility in movement. It can
flexibly adjust the 布料 position (material distribution position)
and adapt to complex building structures. Even in narrow
construction sites or special - shaped building construction, it
can accurately deliver concrete to the designated area.
Equipped with an intelligent control system, it can real - time
monitor the operating parameters of the equipment (such as
pressure, flow, boom status, etc.), realize fault early warning and
automatic protection. It can also perform remote operation and data
transmission, facilitating construction management and maintenance,
and reducing the risk of human operation errors.
Key components are made of high - quality materials and exquisite
craftsmanship. The whole vehicle has undergone strict testing, with
high structural strength and strong wear - resistance, adapting to
harsh construction environments, reducing the equipment failure
downtime, and ensuring long - term stable operation.
From the basement foundation to the upper floor structure, the pump
truck boom can cover different heights and positions, realizing the
vertical and horizontal delivery of concrete and completing the
pouring of components such as columns, beams, and slabs.
It is used for the pouring of the lower foundation (pier) and upper
beam of the bridge. Especially in bridge construction across rivers
and roads, it can flexibly distribute materials and meet the
requirements of large - volume and high - precision concrete
pouring.
In the construction of large - area and large - span floor and
frame structures of industrial factory buildings, it can
efficiently deliver concrete, ensuring construction quality and
progress, suitable for the construction of single - storey or multi
- storey factory buildings.
For concrete pouring in subway stations and urban road
reconstruction, it can accurately operate in complex urban traffic
environments and limited construction sites, completing the
construction of station floor slabs, side walls, road bases, and
surface layers.
Since the pictures do not provide all precise parameters, it is
recommended to confirm the detailed technical specifications in
combination with the equipment nameplate and official information.
Cause: Hydraulic system leakage, solenoid valve failure, poor contact of
the control circuit.
Solution: Check the sealing of the hydraulic pipeline, repair or replace
the leaking components; detect the solenoid valve, replace it if
there is a fault; troubleshoot the circuit and repair the poor
contact points.
Cause: Main oil pump wear, hydraulic oil pollution, valve group failure.
Solution: Overhaul or replace the main oil pump; filter and replace the
hydraulic oil; check the valve group, repair or replace the faulty
valve parts.
Cause: Improper concrete proportion (such as too large aggregate, small
slump), too long pumping interval, wear of the inner wall of the
pipeline.
Solution: Adjust the concrete proportion to meet the pumping requirements;
shorten the pumping interval and clean the pipeline in time; check
the pipeline, and replace it if the wear is serious.
Cause: Insufficient battery power, starter motor failure, control module
damage.
Solution: Charge or replace the battery; overhaul the starter motor; detect
the control module and replace it if necessary.