| Sign In | Join Free | My futurenowinc.com |
|
| Categories | Steel Structure Warehouse |
|---|---|
| Brand Name: | RG_STEEL |
| Model Number: | RG_STEEL |
| Certification: | SGS, BV,ISO |
| Place of Origin: | China |
| MOQ: | 200 Square Meter |
| Price: | USD30-USD99 Per Square Meter/ Negotiable |
| Payment Terms: | L/C,T/T,Western Union |
| Supply Ability: | 20000 Square Meter Per Month |
| Delivery Time: | 30 Days |
| Packaging Details: | As request |
| Application: | Customized Steel Structure Warehouse Building |
| Technician: | Free technical support |
| Color: | Client's Request |
| Surface: | Galvanize or Painted |
| Advantage: | Lightweight |
| Aesthetics: | Modern/Contemporary |
| Certificates: | SGS/Ce/ISO |
| Cost: | Cost-effective |
| Origin: | China |
| Lifespan: | More than 50 years |
| Company Info. |
| Qingdao Ruigang Steel Structure Co., Ltd. |
| Verified Supplier |
| View Contact Details |
| Product List |
Steel Structure Warehouse With Sliding Rolling Doors And Industrial Access Points
Description
Steel structure warehouses are no longer just buildings; they're strategic assets for modern businesses. Their widespread adoption in storage and logistics is a testament to steel's inherent advantages: unmatched strength-to-weight ratio and crucial seismic resistance. The efficiency of prefabrication and rapid on-site assembly drastically compresses construction timelines, delivering operational facilities faster. Moreover, steel's 100% recyclability champions environmental responsibility, making it the sustainable material of choice.
Specification
Items | Specification | |
Mai n Steel Frame | Column/ Beam | q235, q345 welded / hot rolled h section steel |
Secondary Frame | Purlin/ Bracing | q235 c or z purlin / angle steel / round bar |
Main tenance Sys tem | Roof / Wall panel | ppgi single corrugated sheet / eps,rock wool,pir,fiberglass wool panel |
Insulation | fiber glass wool / pe foam | |
Accessories | Window | aluminum alloy window / pvc window etc. |
Door | sliding sandwich panel door / rolling metal door / person entrance door | |
Downspout System | 304 stainless gutter+ pvc pipe | |
Wind Speed | 100km/h to 300km/h | |
Structure Usage | up to 50 years | |
Finish i ng Opti ons | alkyd paint/ epoxy paint/ hot dip galvanized | |

Production Process

Why Steel Structure Warehouse ?
Accelerated ROI: Get your operations active sooner. Steel's rapid construction means you reduce downtime and begin generating revenue faster.
Unrivaled Resilience: Protect your assets with structures designed for extreme conditions. Steel offers superior resistance to fire, corrosion, and the elements, confidently weathering natural disasters like high winds and earthquakes.
Optimized & Flexible Layouts: Achieve maximum utility from your space. Steel's adaptability allows for expansive, column-free interiors and easy customization, perfect for streamlining workflows and storage.
Long-Term Value & Sustainability: Beyond initial savings, steel structures offer reduced operational costs thanks to minimal maintenance and exceptional longevity. Choosing steel also aligns with eco-conscious practices, supporting a circular economy.
Packing & Loading:

Project Sweeps the Globe----Superior Quality, Sold Worldwide:
For over two decades, Ruigang has been a cornerstone of global steel supply. Our consistent $20 million in annual exports to more than 70 countries speaks to our deep expertise and reliable service. With projects spanning continents, we demonstrate a profound understanding of diverse international requirements and a consistent ability to deliver quality on a global scale.


Our Service:
PEB DESIGN | PEB DETAILING |
| Structural Analysis & Design of Steel Buildings | Anchor Bolt Plan (For Construction) |
| Design of Steel Connections | Erection Drawings (For Construction) |
| Preparation of Detailed Calculation Reports | Shop Sketches (For Production) |
| Preparation of Detailed Approval Drawings | Bill of Materials (For Production and Shipment) |
| Estimation of Steel Quantity |


FAQ:
1.You are manufacture factory or trading company?
We are direct manufacture factory, located in Qingdao, China, very
close to Qingdao port. we have strictly quality management
system,professional design team, strong production capacity and
rich manufacturing experience.
2.How about your quality control?
1)we only cooperate with high-quality raw material suppliers with
strength and reputation, and our quality inspection department will
conduct
100% strict testing on the raw materials before entering our
factory.
2)our workers are all certified and regularly assessed, In this
way, we can guarantee the production quality.
3)During the production process, we have three parts:
self-inspection, mutual inspection, and workshop inspection. Only
qualified product can move to next step.
4)Before delivery, inspection working will check everything with
delivery list, to ensure that we send you every items and you can
install it locally.
3.What's the delivery time?
Usually 30 days. Don't worry about the delivery time at all, we
have perfect management plan for each project, then deliver to you
on time.
4.Do you offer service for installation?
Yes,But we will provide very detailed installation drawings and
videos. Generally, you can install it locally,they are all
prefabricated and bolted.
Otherwise , we can also send engineer for guiding installation.
5.What's the payment term?
We have two payment terms.
1)30% advance payment before producing by T/T, and 70% balance by
T/T before shipping.
2)100% irrevoable L/C
6.How to get a fast quotation?
Please send us your project preliminary drawing, then we would
quote you accordingly in 2days. Or we confirm several questions
with you, then do quotation list with details for you timely.
7.Is your price competitive compared with other companies?
We are direct factory, yes, it`s competitive, price and quality are
guaranteed.
Our Steel Structure Fabricaiton Factory:
Situated just 30 km from Qingdao Port in the West Coast New District, our 50,000 sqm facility is a hub of advanced manufacturing. It encompasses five specialized workshops and two modern office buildings, powered by a team of 115 skilled professionals and engineers. We utilize state-of-the-art technologies for every stage, from precision CNC cutting and automated welding to comprehensive coating and sandblasting. This rigorous, multi-step process ensures every custom steel structure meets the highest standards of quality and client specifications.



Certification

Product Attributes



|