| Sign In | Join Free | My futurenowinc.com |
|
| Categories | Copper Nickel Flange |
|---|---|
| Brand Name: | TOBO/ METAL |
| Model Number: | Flange |
| Certification: | BV/ SGS/ TUV/ ISO |
| Place of Origin: | China |
| MOQ: | 1 PC |
| Price: | Negotiatable |
| Payment Terms: | Western Union, L/C, T/T |
| Supply Ability: | 100000000 Piece/Pieces per Month |
| Delivery Time: | 15workdays |
| Packaging Details: | plywood case or pallet |
| Material: | Copper Nickel |
| Size: | 1/2"-48" |
| Product Name: | Copper Nickel Flanges |
| Connection: | Welding |
| Head Code: | Round |
| Surface: | Paint Spraying |
| Technics: | Casting |
| Company Info. |
| TOBO INDUSTRIAL (SHANGHAI) CO., LTD |
| Verified Supplier |
| View Contact Details |
| Product List |
UNS C71500 Copper Nickel CUNI70/30 Lap Joint & Socket Weld Flange ASTM B466
| Product Name | Copper Nickel Flange |
| Brand | TOBO |
| Grade | Copper Nickel 90/10 (C70600 ), Cupro Nickel 70/30 (C71500), UNS C71640 |
| Wall thickness | SCH10, SCH20, SCH30, STD, SCH40, SCH60, SCH80, SCH100 SCH120, SCH160, XS, XXS |
| Pressure | ANSI 150lb-2500lb |
| Technique | Forged |
| Payment term | TT in advance |
| Place of Origin | China |
| Surface Treatment | Transparent oil |
| Product Application | 1. Fence, greenhouse, door pipe,greenhouse |
| 2. Low pressure liquid, water, gas, oil, line pipe | |
| 3. For both indoor and outdoor the building construction | |
| 4. Widely used in scaffolding construction which is much cheaper and convenient | |
| Certificates | API ISO9001-2008,SGS.BV |
| Delivery Time | Usually within 7-15 days after receipt of advance payment |

1. 20 + years of production experience at your service.
2. The fastest delivery
3. The lowest price
4. Most comprehensive standards and materials for your choice.
5. 100% export.
6. Our products export to Africa, Oceania, mid east, eastern Asia,
Western Europe etc.
Packaging Details: Pallet/Wooden Case or as per your Specification
Delivery Detail: Shipped in 30 days after payment

A: We are factory.
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
A: Payment<=10000USD, 100% in advance. Payment>=10000USD, 50% T/T in advance ,balance before shippment.
|