| Sign In | Join Free | My futurenowinc.com |
|
| Categories | Mud Pump Parts |
|---|---|
| Brand Name: | LONGWELL |
| Model Number: | Oil Drilling Mud Pump |
| Certification: | API-7K |
| Place of Origin: | China |
| MOQ: | 1 PCS |
| Packaging Details: | Plywood case/Iron pallet |
| Payment Terms: | T/T 30%DP, balabce before ship |
| Supply Ability: | 1000 PCS per Month |
| Forthputting: | drill rig |
| Service Life: | 5000-8000 hours |
| Rated Pressure: | 7500Psi |
| Process: | Forging |
| Weight: | 25,000 lbs |
| Power: | 1600 Horsepower |
| Temperature: | UP TO 80 DEG |
| Test Report: | Provide |
| Industry: | Oilfield Drilling |
| Maximum Flow Rate: | 1600 GPM |
| BOMCO: | F800/1000/1300/1600/1600HL |
| HONGHUA: | 3NB-800/1000/1300/1600F |
| HRSB: | RS-F800/1000/1300/1600 |
| INGZHOU: | QF-1300/1600 |
| LS-NOW: | 3NB1300C/1600 |
| NOV: | 12-P-160 14-P-220 |
| WeatherFord: | MP-10/16 |
| GD: | PZ-7/8/9/10/11 |
| EMSCO: | FB-1300/1600 |
| RUSSIAN: | UNBT-950/1180L UNB-600 8T650 |
| Company Info. |
| Xian LongWell Machinery Equipment Co., LTD |
| Verified Supplier |
| View Contact Details |
| Product List |
The discharge manifold is connected with 3 cylinder blocks simultaneously too. It has two ports at left and right side. The drilling fluid can be discharged from left side or right side.
The discharge filter shall be installed at the other side of
discharge manifold. The discharging mud go to the drilling fluid
line (manifold) after filtering.
Before the mud discharge manifold needs to be repaired, the bypass
valve on pressure release line should be opened first, and let the
pressure in discharge manifold to be released to zero.
Then install suction manifold and discharge manifold. After
adjusting and aligning each part well, use a torque wrench to
tighten the connection bolts between suction manifold, discharge
manifold and cylinder blocks respectively to specified torque.

(1) Wash the contacting face between discharge manifold and
cylinder blocks well, install the seal ring and put it onto
cylinder blocks. The tightening torque of bolt M39×3 is
1954~2255N.m.
(2)As per discharge manifold requirement, install the accessory manifold (5-way or 4-way), discharge pulsation dampener, relief valve, bypass valve, and pressure release line etc. The tightening torques of bolts and nuts are required to meet clause 12.2.1.
The suction manifold is connected to 3 cylinder blocks
simultaneously. It has three ports at left , middle and right. The
drilling fluid can be sucked in from left, right or middle port
according to your desire.
(1) Install the suction manifold: clean the flange end face of
suction manifold,install seal rings and connect it to three
cylinder block. The tightening torque of bolt M39×3 is 321~370N.m
(2) Install suction the suction desurger:install the suction desurger onto the suction manifold.

|