| Sign In | Join Free | My futurenowinc.com |
|
| Categories | Desiccant Masterbatch |
|---|---|
| Brand Name: | Ecoplas |
| Model Number: | PE-200 |
| Place of Origin: | Guangdong, China |
| MOQ: | 1kg |
| Price: | negotiable |
| Payment Terms: | T/T |
| Supply Ability: | 1500 Tons per month |
| Delivery Time: | 7 DAYS |
| Packaging Details: | 25kg/carton, 22-26 tons per 20ft container |
| Product: | Color Masterbatches |
| Carrier: | Polyethylene |
| Appearance: | Grey Pellet |
| Application: | Garbage Bags, Shopping Bags, Toys, etc |
| Packing: | 25kg/carton |
| Shelftime: | half year when keep in good packing condition |
| Adding Rate: | 1%-5% |
| Sample: | Free |
| Company Info. |
| Ecoplas Material Co., Ltd |
| Verified Supplier |
| View Contact Details |
| Product List |
Absorbing Moisture Color Masterbatches For Injecting Piping Sheeting
Desiccant Masterbatch Absorbing Moisture In Recycle for Blowing Film Injecting Piping Sheeting
Product No.: PE-200
| Superiority |
Over 14 years history in Masterbatch making
Products can be customized
Good price with no middleman in trade
Advanced equipments for testing and manufacturing
24 hours after-sale service
| Prouduct Specification and Application |
Desiccant Masterbatch is used for absorbing water in recycle material like polyethylene, polypropylene, filler, additives, etc. It is an enviromment-friendly product.
It can be applicated in:
1.Film ( Garbage bags, shopping bags, casting film, multilayer
film, stretch film, etc.)
2.Extrusion Molding ( sheet, plate, hollow plate, Pipe, Wire,
Cable,etc.)
3.Injection Molding ( Automotive, Electronic, Construction,
Housewares, Furniture, Toys, cutlery, buckets, etc.)
| Technical Data | |||
| Index | Value | Unit | Test Standard |
| Material | CaO | 80% | / |
| Carrier | LDPE | % | / |
| Density | 1.7( +/- 0.05) | g/cm3 | GB/T1033-86 B |
| Melt Flow Rate | <3.00 | g/10min (200℃/2.16Kg) | GB/T3682-2000 D |
| Water Content | <0.1 | % | IR |
| Processing Temperature | 140-320 | ℃ | / |
| Adding Rate | |||
Recommend 1-5%, and adjustable according to demands
| Packing and Delivery |
Package: 25KG/Bag, 26tons per 20ft container
25KG/Carton, 22-26 tons per 20ft container
Leadtime: 7 days after order confirmed
|