1000Psi Bop Well Control Equipment , 30" Drilling Diverter System
|
... the surface layer driling before BOP. The diverter assembly is the uppermost component of the riser system.It is not used to shut or seal the well completely, but to either direct the returning drill fluid or control the blowout and surface layer gas.When...
Dongying Oilman Machinery Equipment Co.,Ltd.
|
Spherical Rubber Packing Element Annular Bop Well Control Equipment New Condition
|
API 16A Oil Well Double RAM BOP Shear ram Blind and Packing Element The sealing element for the RAM BOP including TOP seal and Front Seal. The seal assembly can match and interchange most of domestic BOP manufactories including Shanghai Shenkai, Huabei ......
XI‘AN ZZTOP OIL TOOLS CO.,LTD
|
Accumulator for Blowout Preventer BOP Control Equipment, BOP Remote panel
|
...ing drilling or workover in petroleum and natural gas industry. The function of the blowout preventer accumulator unit for surface mounted Bop stacks is preparing and prestoring enough hydraulic oil and controlling its flow direction, in order to open or...
Dongying On-tech Equipment Co., Ltd
|
5000 PSI BOP Hydraulic Control System Wireline Pressure Control Equipment
|
... pressure control equipment using on slickline operation to seal off the wire, and the sealing of the wire according the rubber seal packing. The BOP plunger of the blowout system is used for the sealing of the downhole pressure after the wire break.The...
Ruixin Energy Equipment
|
Wireline BOP Configuration Control Valve For Wireline Pressure Control Equipment
|
... and wellhead / Christmas Tree, BOP is one of the major well control equipment, specialized valve used to to seal, control and monitor oil and gas wells to prevent blowout or the uncontrolled release of crude oil and/or natural gas from a well. The...
XI 'AN ZZ TOP OIL TOOLS CO.,LTD
|
BOP Wellhead Pressure Control Equipment API Wireline Blowout Preventer
|
... seal the wellhead in the coiled tubing working, and located on the surface oilfield between wellhead an lubricator. The wireline BOP provide blowout protection during the wireline operation and slickline operation. The wireline BOP / Wireline valve is...
Techcore Oil Tools Co.,Ltd,
|
API 7 1/16 inch 3000psi Double Ram Bop Well Drilling Control Equipment
|
...operation, ease of maintenance, and safety. The Double Ram Bop comprises a housing, side gate, hydro-cylinder, cylinder cap, piston, piston rod, lock shaft, sealing parts, and ram. The hydraulic ......
Hebei E-valves Petroleum Equipment Co., Ltd.
|
U Shape Dual Ram BOP Blowout Preventer Equipment 7 1/16" - 13 5/8"
|
...Dual Ram BOP Blowout Preventer Equipment 7 1/16"~13 5/8" BOP Description Drilling BOP is mainly used to control well pressure by quick well shut in case of overflow and well kick to prevent blowout. BOP Features U-shape Dual Ram BOP Pressure containing......
Shaanxi FORUS Petroleum Machinery Equipment Co., Ltd
|
API Cameron Double Ram Bop / Annular BOP For Oil Gas Wellhead Control Equipment
|
Production Information Of BOP The Blowout Preventer (BOP) provides a dependable and user-friendly support system for operating the screw pump. To mitigate wear, the rams and ram rods undergo a nitriding process to enhance their durability. Advanced rams......
Puyang Zhongshi Group Co., Ltd.
|
Injection Temperature Control Equipment Single Color One Side 380V 50HZ
|
...Control Equipment Single Color One Side 380V 50HZ Single Function Rapid Heating And Rapid Cooling Mold Temperature Controller Specification Item Unit JD-S-60 Power source V 380V;50HZ Total power KW 65 heating power KW 2.2 cooling power KW 3 Flow rate of cooling pump L/MIN 67 Flow rate of heating pump L/MI N 33 inlet/outlet of cooling MM DN25 Soften water connector MM DN25 Diverter......
Shenzhen JiDing Technology Co., Ltd
|
