Sign In | Join Free | My futurenowinc.com
futurenowinc.com
Products
Search by Category
Home > Art & Collectible >

134 - 200 TPD LNG Liquefaction Plant Skid Mounted Low Consumption

Categories LNG Plant
Place of Origin: Sichuan, China
Brand Name: Rongteng
Certification: IS09001 IS014001 EN15085
MOQ: Negotiation
Price: Negotiation
Packaging Details: Customized, Standard Packaging
Payment Terms: L/C,T/T,etc.
Name: LNG Liquefaction Plant
Design: Modular design
Features: safe, reliable, environmental protection
Gas Source: natural gas, coalbed methane, shale gas, flare gas, methane, biogas ,etc
Advantage: Low energy consumption
Capacity: 134 - 200 TPD
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

134 - 200 TPD LNG Liquefaction Plant Skid Mounted Low Consumption

134~200 TPD LNG LIQUEFACTION PLANT


Short Description:


● Mature and reliable process
● Low energy consumption for liquefaction
● Skid mounted equipment with small floor area
● Easy installation and transportation


PRODUCT DETAIL

The feed natural gas from the upstream flows through the pipeline at a pressure of 5.0 ~ 6.0MpaG enters the feed gas inlet filter separator after pressure regulating, and enters the downstream system after separation and metering.
The main process equipment is feed gas filter separator, flowmeter, pressure regulator, etc.

Feed gas filtration separation and pressure regulating unit

1) Process description

The feed natural gas from the upstream flows through the pipeline at a pressure of 5.0 ~ 6.0MpaG enters the feed gas inlet filter separator after pressure regulating, and enters the downstream system after separation and metering.

The main process equipment is feed gas filter separator, flowmeter, pressure regulator, etc.

2) Design parameters

Processing capacity: 20×104Nm3/day

Adjustment range: 50% ~ 110%

Pretreatment system

Feed gas deacidification unit

1)Process description

The feed gas from the upstream enters the deacidification gas unit, which uses MDEA solution to remove acid gases such as CO2 and H2S in the feed gas.

Natural gas enters from the lower part of the absorber (absorbing tower) and passes through the absorber from bottom to top; The fully regenerated MDEA solution (lean solution) enters from the upper part of the absorber and passes through the absorber from top to bottom. The reverse flow MDEA solution and natural gas are fully contacted in the absorber, the CO2 in the gas is absorbed and enters the liquid phase, and the unabsorbed components are led out from the top of the absorber and enter the decarbonization gas cooler and separator. The gas from the decarbonization gas separator enters the feed gas mercury removal unit, and the condensate goes to the flash tank.

The content of CO2 in the treated natural gas is less than 50ppmv.

The MDEA solution absorbing CO2 is called rich solution, which is sent to the flash tower, and the natural gas flashed by depressurization is sent to the fuel system. After heat exchange between the flash rich liquid and the solution (lean liquid) flowing out from the bottom of the regeneration tower, raise the temperature to ~ 98 ℃ to the upper part of the regeneration tower, and carry out stripping regeneration in the regeneration tower until the lean degree of the lean liquid reaches the index.

The lean liquid out of the regeneration tower passes through the rich and poor liquid heat exchanger and lean liquid cooler. The lean liquid is cooled to ~ 40 ℃, pressurized by the lean liquid pump and enters from the upper part of the absorption tower.

The outlet gas at the top of the regeneration tower enters the acid gas separator through the acid gas cooler, the gas from the acid gas separator is sent to the acid gas discharge system, and the condensate is sent to the flash separator after being pressurized by the recovery pump.

The heat source of reboiler of regeneration tower is heated by heat transfer oil. The main process equipment of this unit are absorption tower and regeneration tower.

Quality 134 - 200 TPD LNG Liquefaction Plant Skid Mounted Low Consumption for sale
Send your message to this supplier
 
*From:
*To: Sichuan Hengzhong Clean Energy Equipment Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0